background image

6

7

8

9

10

11

12

13

14

15

16

18

17

Base Station Installation

Power Box Installation

Finish

Chap. 4.5

Connect the wire

Connect the Plot Connector

Chap. 4.6

Insert 2 Pegs

Chap. 4.6

One-Time Setup

10

9

11

Mount 

Bracket

Connect 

15cm extension cable

Chap. 4.6

Chap. 4.7

Chap. 4.7

Turn Safety Switch ON

Operating Panel

Chap. 5.2.1

Choose Measurements Units

Chap. 5.2.2

Scroll

Choose / Confirm

Scroll

Back / Cancel

Meter

Celsius

24 Hours

Foot

Fahrenheit

12 hours (AM / PM)

Set Day & Time

Chap. 5.2.3

Set Lawn Size

Chap. 5.2.4

Peg Base

Chap. 5.2.5

Press OK

Test Base Station Position

Chap. 5.2.5

Press OK

Possible Error 

Messages:

Confirm steps 7,10,11

Swap wires in 

plot connector

Reposition 

Base Station

Press OK

Reviews: