background image

WALL/CEILING PREPERATION 

RECIRCULATION 
For recirculation, do not cut 170mm hole and purchase a charcoal filter. 
For other accessories, parts and service, please contact your local supplier or approved service agent 
 

DUCTED 

For ducted installation, it is recommended you use 150mm diameter rigid / semi rigid ducting this 
will require a 170mm hole in the ceiling / wall. 
 
Before drilling any holes check the area behind the surface to be drilled is clear of any electrical 
cables, pipes etc.  

 
 
 
 
 
 
 
 
 
 
 
 

NOTE

: Fixing to a solid stud is recommended. 

 

 
 

1.

 

Pre  drill  pilot  hole  3mm  diameter  at 
dimensions C and B. 

        B=485mm and C=220 
2.

 

Loosely  fix  the  mounting  screw  and  2  x 
washer in position, check with a spirit level 
across the washers to ensure they are level. 

3.

 

Mark  the  position  of  the  decorative 
chimney  at  the  ceiling  and  wall.  Cut  the 
cornice  moulding  away  if  required,  to 
enable  the  chimney  to  fit  flush  against  the 
wall and ceiling. 

4.

 

Mark  and  cut  out  the  hole  in  the  ceiling  / 
wall to fit the ducting. (170mm dia.) This is 
positioned centrally above the canopy hood 
and  85mm  from  the  wall.  (For  ceiling 
option) 

5.

 

Using  the  screws  supplied,  fix  the  chimney  bracket  to  the  wall,  100mm  below  the  ceiling 

 

checking that it is aligned with the hood. 

6.

 

Remove the protective plastic covering from all parts including the filters. Fit the canopy hood 

 

on the mounting screws, tighten  screws. Plug in the power cord to the supply and check the 

 

function of the canopy hood. Connect and secure the ducting (use duct tape if required).  

7.

 

Assemble  the  top  chimney  to  the  chimney  bracket  and  fix  using  the  screws  supplied,  then 

 

assemble the bottom chimney to the canopy hood and fix using the screws supplied. 

8.

 

Remove transport tape that holds the oil cup in place under the motor unit and fit the filters. 

DIA 170

85 TO C

100

DIM  B

DIM C

DIM  

A

SEE NOTE

L

Summary of Contents for RHCI9SS - IMPRESA

Page 1: ... during installation if abraded or knocked by tools Note all ducting must comply with local requirements and building codes A power outlet should be within 1200mm from the motor assembly and can be either on the wall behind the chimney or in the ceiling All electrical work must be done in accordance with local and or national electrical codes as applicable For safety this product must be earthed I...

Page 2: ...CANOPYHOOD C FILTER SURFACE HOB TOP B A A 600mm electric cook top min A 650mm gas cook top min B 485mm C 220 The canopy hood is designed for 2400mm ceilings The chimney is telescopic and is designed for hood installations between 600 to 750mm above the cooking surface Ascertain the desired installation height of the canopy hood Any installation above 750mm will compromise the extraction performanc...

Page 3: ...l Cut the cornice moulding away if required to enable the chimney to fit flush against the wall and ceiling 4 Mark and cut out the hole in the ceiling wall to fit the ducting 170mm dia This is positioned centrally above the canopy hood and 85mm from the wall For ceiling option 5 Using the screws supplied fix the chimney bracket to the wall 100mm below the ceiling checking that it is aligned with t...

Page 4: ...ung children or infirm persons without supervision Young children should be supervised to ensure that they do not play with the canopy hood There shall be adequate ventilation of the room when the canopy hood is used at the same time as appliances burning gas or other fuels A partial vacuum in the room could result in too high a concentration of gas in the air You must read the details concerning ...

Reviews: