background image

RGT - SERIES 

APPROVED                                    Page 5 of 6 
ISSUE: C 
ECN 07 033 

SECTION 3. 

 

POWER CORD REPLACEMENT

 

 
3.1 

REMOVE MOTOR HOUSING AS PER THE INSTRUCTIONS IN 
SECTION 1 

3.2 

REMOVE THE TOP COVER (3 SCREWS). 

3.3 

REMOVE THE CABLES FROM THE CONNECTOR BLOCK . 

3.4 

PULL OUT POWER CORD AND RECONNECT NEW CORD. 

3.5 

CARRY OUT EARTH TEST BEFORE CONNECTING TO POWER 

3.6 

REPLACE IN REVERSE ORDER AS ABOVE 

3.7 

TEST TO ELECTRICAL SAFETY STANDARDS 
 

Summary of Contents for RGT6WH

Page 1: ...RGT SERIES APPROVED Page 1 of 6 ISSUE C ECN 07 033 GRANGE II RANGE HOOD MODEL RGT6WH RGT6BL RGT6SS RGT9WH RGT9BL RGT9SS SERVICE MANUAL ...

Page 2: ...RGT SERIES APPROVED Page 2 of 6 ISSUE C ECN 07 033 RGT6WH RGT6BL RGT6SS RGT9WH RGT9BL RGT9SS ...

Page 3: ...21 5 Filter Aluminium 288 x 362 5 103793 103793 103793 Filter Charcoal 288 x 362 5 103793C 103793C 103793C 6 Recirculating Cover 103854WH 103854BL 103854BL 7 3 Speed Switch Assembly 103417WH SP 103417BL SP 103417BL SP 8 Diffuser 101112 101112 101112 10 Twin Motor Housing 103853 103853 103853 11 Recirculating Duct 103915 103915 103915 12 Switch Cover 600mm 103921 103921 103921 12 Switch Cover 900mm...

Page 4: ... 1 10 LIFT MOTOR HOUSING FRONT EDGE DRAW POWER CABLE THROUGH BACK 1 11 REMOVE MOTOR HOUSE FROM BODY 1 12 REASSEMBLE RANGEHOOD IN REVERSE TO PROCEDURE ABOVE TAKING CARE TO PULL AS MUCH OF THE POWER CORD OUT OF THE BODY AS POSSIBLE 1 13 TEST TO ELECTRICAL SAFETY STANDARDS SECTION 2 SWITCH REPLACEMENT 2 1 REMOVE THE SWITCH BRACKET 2 2 REMOVE SWITCH ASSEMBLY FROM THE SWITCH BRACKET 2 3 REMOVE THE LID ...

Page 5: ...HOUSING AS PER THE INSTRUCTIONS IN SECTION 1 3 2 REMOVE THE TOP COVER 3 SCREWS 3 3 REMOVE THE CABLES FROM THE CONNECTOR BLOCK 3 4 PULL OUT POWER CORD AND RECONNECT NEW CORD 3 5 CARRY OUT EARTH TEST BEFORE CONNECTING TO POWER 3 6 REPLACE IN REVERSE ORDER AS ABOVE 3 7 TEST TO ELECTRICAL SAFETY STANDARDS ...

Page 6: ...RGT SERIES APPROVED Page 6 of 6 ISSUE C ECN 07 033 WIRING DIAGRAM ...

Reviews: