RGT - SERIES
APPROVED Page 5 of 6
ISSUE: C
ECN 07 033
SECTION 3.
POWER CORD REPLACEMENT
3.1
REMOVE MOTOR HOUSING AS PER THE INSTRUCTIONS IN
SECTION 1
3.2
REMOVE THE TOP COVER (3 SCREWS).
3.3
REMOVE THE CABLES FROM THE CONNECTOR BLOCK .
3.4
PULL OUT POWER CORD AND RECONNECT NEW CORD.
3.5
CARRY OUT EARTH TEST BEFORE CONNECTING TO POWER
3.6
REPLACE IN REVERSE ORDER AS ABOVE
3.7
TEST TO ELECTRICAL SAFETY STANDARDS