Table 3: Component Package Guide
Although not recommended, additional tube lengths may be added to the heater. Tubing must be aluminized
(heat-treated), or porcelain coated. Additional tube lengths beyond the specified minimum tubing length are
considered vent pipe for length determination. Maximum vent length allowed is 45' (13.7 m) total.
Model
Tubing Length
Standard Core Packages
Minimum
Aluminized
Stainless Steel
NHE-40
10’ (3m)
CP10ALUM
CP10ALUM
NHE-60
20’ (6m)
CP20ALUM
CP20ALUM
NHE-80
20’ (6m)
CP20ALUM
CP20ALUM
NHE-100
30’ (9m)
CP30ALUM
CP30ALUM
NHE-125
30’ (9m)
CP30ALUM
CP30ALUM
NHE-150
40’ (12m)
CP40ALUM
CP40ALUM
NHE-175
50’ (15m)
CP EXP20ALUM
CP EXP20ALUMSS
Summary of Contents for NDUSTRIA NHE Series
Page 2: ......
Page 4: ......
Page 21: ...SECTION 6 HEATER INSTALLATION 17 FIGURE 16 Linear Heater Layout Overview ...
Page 37: ...SECTION 7 OPTIONAL HEATER ACCESSORIES 33 FIGURE 26 U Tube Heater Layout Overview ...
Page 69: ...SECTION12 TROUBLESHOOTING 65 ...
Page 74: ...NHE SERIES INSTALLATION OPERATION AND SERVICE MANUAL 70 ...
Page 76: ...NHE SERIES INSTALLATION OPERATION AND SERVICE MANUAL 72 ...
Page 77: ...SECTION 15 THE NDUSTRIA NHE WARRANTY 73 2020 ...
Page 78: ...NHE SERIES INSTALLATION OPERATION AND SERVICE MANUAL 74 ...