BH-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
22
Step 6.5.1 Reflector, U-Clip and Reflector Support Installation
The pictorial drawings of the heater construction in
Section 6
are schematic only and provide a general
guideline of where hangers, reflector supports and
U-clips are to be installed.
To ensure proper expansion and contraction
movement of the reflectors, a combination of U-clips
and reflector supports are used. The positioning of
reflector supports and U-clips depend on the
individual installation. The following rules must be
observed.
2. The overlap at the first and second reflector is a
slip overlap.
Thereafter, every third reflector joint is a slip overlap. A slip
overlap is achieved by either:
a.) both reflectors lay inside a hanger.
(No reflector support needed.)
b.) using a reflector support with
loose screws at the reflector
overlap.
3. The remaining reflector overlaps require a
non-slip
overlap
connection. To affix the reflectors together in
a non-slip overlap either:
a.) use reflector support and tight screws.
b.) if both reflectors lay inside a hanger, u-clips or
sheet metal screws may be used.
This section of three reflectors joined together must
be affixed to the tube with at least one reflector support
with tight screws.
Reflector
End Cap
U-clips
1. The first reflector after the burner must be affixed in
the middle of the reflector with a reflector support and
tight screws.
First Reflector
6"
(16 cm)
Overlap must be a
minimum of 6" (16 cm).
Loose screws
loosened 1/16"
(.16 cm) to allow
slippage.
2 A
Slip Overlap
Reflector
Support
2 B
Slip Overlap
Reflector
Tight
Screws
3 B
Non-Slip Overlap
U-clip
(2 Clips per
Non-slip Overlap
Inside a Hanger)
Reflector
3 A
Non-Slip Overlap
Wire Form
Reflector Support
Strap
Tight
Sheet Metal
Screw
Description
Part Number
Reflector Support Packa
g
e
03050010
Wire Form
91908004
Reflector Support Strap
03050000
Screw #8 x 3/4"
94320812
U-Clip Package
91107720
Reflector End Cap
027508XX