![Roberts Gorden DF Installation, Operation & Service Manual Download Page 23](http://html.mh-extra.com/html/roberts-gorden/df/df_installation-operation-and-service-manual_1469679023.webp)
SECTION 6: H
EATER
I
NSTALLATION
19
FIGURE 18: Linear Heater Layout Overview (Continued)
Step 6.1 Burner Tube Installation
7' 6" ± 1'
(229 cm ± 25 cm)
NOTE:
Tubing requires a downward
slope of 1/2" (13 mm)
per 20' (6 m) away
from burner.
S-Hook
Burner Tube
Hanger
Offset mounting
hole must be
to the top.
Weld seam
must be to the
bottom of the tube.
Description
Part Number
Burner Tube
03051XXX
S-Hook
91907302
Tube/Reflector Hanger
0309010X
Summary of Contents for DF
Page 2: ......
Page 4: ......
Page 21: ...SECTION 6 HEATER INSTALLATION 17 FIGURE 16 Linear Heater Assembly Overview ...
Page 37: ...SECTION 7 OPTIONAL HEATER ACCESSORIES 33 FIGURE 25 U Tube Heater Layout Overview ...
Page 58: ...DF SERIES INSTALLATION OPERATION AND SERVICE MANUAL 54 10 3 Internal Wiring ...
Page 59: ...SECTION 10 WIRING 55 10 4 Ladder Diagram 10 5 Electrical Connection to the Burner ...
Page 64: ...DF SERIES INSTALLATION OPERATION AND SERVICE MANUAL 60 12 1 Troubleshooting Flow Chart ...
Page 65: ...SECTION 12 TROUBLESHOOTING 61 ...
Page 66: ...DF SERIES INSTALLATION OPERATION AND SERVICE MANUAL 62 12 2 Manifold Gas Pressure Setting ...
Page 68: ...DF SERIES INSTALLATION OPERATION AND SERVICE MANUAL 64 ...
Page 72: ......
Page 73: ...2020 ...
Page 74: ......