UHD L
OW
P
ROFILE
D
UCT
F
URNACE
I
NSTALLATION
O
PERATION
AND
S
ERVICE
M
ANUAL
44 of 47
SECTION 16: SPECIFICATIONS
16.1 Dimension Data
Model
A
B
C
D
E
F
G
H
J
K
L
M
N
P
Q
R
S
T
UHD[X][S]
75
in
(cm)
28.5
72.4
17.6
44.7
20.3
51.6
17.6
44.7
16.6
42.2
1.25
3.2
6.3
16.0
6.1
15.5
2.8
7.1
1.6
4.1
3.4
8.6
6.7
17.0
18.2
46.2
5.5
14.0
4.4
11.2
6.8
17.3
1.8
4.6
32
81.3
UHD[X][S]
100
in
(cm)
28.5
72.4
22.6
57.4
20.3
51.6
17.6
44.7
16.6
42.2
1.25
3.2
7.0
17.8
6.0
15.2
2.4
6.1
1.6
4.1
3.4
8.6
6.7
17.0
18.2
46.2
6.3
16.0
4.4
11.2
6.8
17.3
1.8
4.6
37
94
UHD[X][S]
125
in
(cm)
28.5
72.4
22.6
57.4
20.3
51.6
17.6
44.7
16.6
42.2
1.25
3.2
7.0
17.8
6.0
15.2
2.4
6.1
1.6
4.1
3.4
8.6
6.7
17.0
18.2
46.2
6.3
16.0
4.4
11.2
6.8
17.3
1.8
4.6
37
94
Summary of Contents for Combat UHDXS 100
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 29: ...SECTION 9 GAS PIPING 21 of 47 Figure 14 Gas Connection ...
Page 43: ...SECTION 14 TROUBLESHOOTING 35 of 47 14 1 General ...
Page 54: ...UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 46 of 47 ...
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......