background image

LLS-100TS

User manual

11

5 Precautions

1. During the installation process, please standardize the operation. After installation, please clean up the
site to keep it clean and tidy.
2. After testing the equipment in the office or warehouse, please be sure to turn the switch to OFF. When
testing in the office or warehouse, the equipment cannot be exposed to direct sunlight, cannot be charged,
and is always in a state of power consumption.
3. The waterproof adhesive must be attached.

6 Question

The device does not return

information

The installation position of the equipment is not suitable, and it may

be in a metal shielded area
The device is in a signal dead zone;
The SIM card has not been activated or is in arrears;
SIM card installation error, please open the lower cover to confirm;
The device has insufficient power;

Inaccurate return position

The installation location of the equipment is not suitable and cannot

face the sky;
The device is in an area without GPS signals;

Device does not charge

The device is in an area without GPS signals;
The installation position of the equipment is not suitable and cannot

be exposed to the sun;

Summary of Contents for LLS-100TS

Page 1: ...LLS 100TS User manual 0 User Manuel LLS 100TS...

Page 2: ...ntroduction 2 1 1 product description 2 2 Product Overview 3 2 1 Product accessories 3 2 2 Device LED light and push button 4 2 3 Parameters 5 3 Product Function 7 3 1 Function 7 4 Equipment installat...

Page 3: ...er through the button 1 2 Technical Parameters 1 Platform Low power MCU CDMA GPRS module GPS Beidou dual mode positioning module G sensor 2 Band GSM850 GSM900 DCS1800 PCS1900 3 Module of 4G Version op...

Page 4: ...19 Applicable environment 20 C 75 C 20 Humidity 30 95 21 Device Dimensions 264mm 90mm 25mm 22 Bracket 264mm 63 5mm 17mm 23 Device bracket 264mm 90mm 28 5mm 24 Weight Device 176 g Accessories 125 g Ab...

Page 5: ...LLS 100TS User manual 4 Waterproof sticker 1 Waterproof sticker 2 M3 11 screws Bracket with magnet 2 2 Device LED light and push button...

Page 6: ...istered it will turn on and off in 2 seconds 3 Register for GSM no GPRS fast flash once in 4 seconds 4 With GPRS flash 2 times in 4 seconds Note Press and hold the sos button for 3 seconds the SOS ala...

Page 7: ...B8 TD SCDMA B34 B39 3G CDMA BC0 GSM 900 1800MHz GPS chip MTK AG3331 The whole GT1612 AGBD Tracking sensitivity 165dBm Capture sensitivity 156dBm Acquisition 148dBm Positioning accuracy 10 meters CPU...

Page 8: ...rd and is resistant to salt spray corrosion 8 Having a solar charge status inquiry 9 Flexible setting of the location upload interval respectively setting the parking and uploading data upload interva...

Page 9: ...al 8 Step 2 Turn on the switch Set the switch next to the SIM card to the ON position and light up As shown place the SIM card After the switch is turned to the ON position the indicator light on the...

Page 10: ...the square SIM cover seal ring in the fitting package in the rear cover slot of the main engine then press the SIM card pressure plate into the square SIM card waterproof ring and buckle into the rea...

Page 11: ...bracket with 4 M3 11 stainless steel cross head screws as shown below note 1 One side of the main engine with indicator lamp is close to the side of the support with magnet otherwise there is no disas...

Page 12: ...attached 6 Question The device does not return information The installation position of the equipment is not suitable and it may be in a metal shielded area The device is in a signal dead zone The SI...

Page 13: ...LLS 100TS User manual 12 No disassembly alarm Please confirm whether there is strong magnetic on the mounting bracket Whether the side of the device indicator is close to the direction of the magnet...

Reviews: