
SD-1GH
- 48 -
CH2Cl2 (Methylene chloride) 500 ppm
Isobutane: 3600 ppm
CH4 (Methane)
2000 ppm Methane: 2000 ppm
EO (Ethylene oxide)
1000 ppm Hydrogen: 1000 ppm
MEK (Methyl ethyl ketone)
500 ppm
Hexane: 3000 ppm
R404a
2000 ppm Isobutane: 1000 ppm
* Not all listed cylinders have RKI part numbers (see pg. 57 for
cylinder part numbers). Contact RKI if you need a cylinder that
does not have a part number.
i. Install the calibration cup and use a humidifier to connect the regulator to the calibration cup’s
GAS IN fitting.
Hold the humidifier by the clear tubes at the end. Do not hold the humidifier tube
itself.
j. Turn the regulator knob counterclockwise to open it and allow the gas to flow for 2 minutes.
k. Press and release SET.
l. Turn the regulator knob clockwise to close it. Unscrew the regulator from the calibration cylinder.
Leave the calibration cup and humidifier attached to perform a calibration in step 12.
m. The load voltage is displayed. Adjust the load voltage to match the value shown below.
Detection Gas
Load Voltage
C2H5OH (Ethanol)
2000 ppm 600 mV ± 20 mV
5000 ppm 600 mV ± 20 mV
C3H3N (Acrylonitrile)
400 mV ± 20 mV
C5H10O2 (Propyl acetate)
700 mV ± 20 mV
C6H6 (Benzene)
100 ppm
400 mV ± 20 mV
500 ppm
600 mV ± 20 mV
C6H14 (Hexane)
500 ppm
600 mV ± 20 mV
3000 ppm 600 mV ± 20 mV
CH2Cl2 (Methylene chloride)
400 mV ± 20 mV
CH4 (Methane)
400 mV ± 20 mV
EO (Ethylene oxide)
600 mV ± 20 mV
MEK (Methyl ethyl ketone)
700 mV ± 20 mV
R404a
600 mV ± 20 mV
n. Press and release SET.
o. The display will either show
PASS
or the load voltage will flash. If the load voltage flashes,
adjust the voltage to the correct value, shown above, and press and release SET.
p. Press and release ESC to return to Maintenance Mode.
q. Press and hold ESC to return to Detection Mode.
12. Calibrate the detector as described on page 43.
<J-Box O-Ring Replacement>
1. Use a 4 mm hexagonal screwdriver (Allen wrench) to unscrew the 4 screws that secure the j-box lid to
the body. The screws are captive and will not fall out.
2. Remove the old O-ring.
3. Install the new O-ring in the groove. Make sure it sits flat.
4. Close the j-box lid and tighten the screws to a torque of 215.6 ± 24.5 N cm (22.0 ± 2.50 kgf cm).
Summary of Contents for SD-1GH
Page 53: ... 53 SD 1GH 10 2 ATEX IECEx Outline Drawing ...
Page 60: ...SD 1GH 60 ...