65-2443SS PPM Hydrogen Transmitter • 15

Replacing the Amplifier

If you are replacing the amplifier, it is likely that the transmitter has been off power for an extended 
period. Make sure to follow the preliminary calibration recommendation and the burn-in period 
recommendation before making the final calibration.

1. Turn off power to the controller.

2. Place the controller’s on/off switch in the OFF position.
3. Remove the junction box cover.
4. Unplug the detector terminal strip and controller terminal strip from their sockets. You may leave 

the wires connected to the terminal strips.

5. Unscrew and remove the screw with the flat and lock washers that secures the amplifier to the 

junction box.

6. Remove the old amplifier.
7. Install the detector and controller terminal strips into their sockets on the new amplifier as shown 

in Figure 4 on page 11 of this manual. If controller leads or detector leads were removed during 
this procedure, refer to Tables 4 and 5 below.

8. Install the amplifier into the junction box with the screw, lock washer, and flat washer you 

removed in Step 5 above. A foam gasket that orients the amplifier and keeps it from rotating is 
installed on the bottom of the amplifier. Make sure the amplifier is seated flat in the junction box.

NOTE:

When a transmitter is first powered up with a new amplifier, the initial output may be either 
high or below zero. Be sure to make arrangements so that this does not cause unwanted 
alarms.

9. Turn on power to the controller.
10. Turn on the controller and place it into normal operation.

Table 4:Reconnecting the PPM Hydrogen Amplifier to the Controller

Amplifier’s Controller 

Terminal Strip

Controller’s Transmitter 

Terminal Strip (typical)

-

-  (DC  -)

S

S (4 - 20 mA In)

+

+  24V

Table 5:Reconnecting the PPM Hydrogen Detector to the Amplifier

Detector Lead

Amplifier’s Detector 

Terminal Strip

Red

R

White

W

Black

B

Summary of Contents for 65-2443SS

Page 1: ...RKI Instruments Inc www rkiinstruments com 65 2443SS PPM Hydrogen Transmitter Operator s Manual Part Number 71 0549 Revision P1 Released 3 4 21...

Page 2: ...ic calibration and maintenance of the detector is essential for proper operation and correct readings Please calibrate and maintain this detector regularly Frequency of calibration depends upon the ty...

Page 3: ...pair costs transportation costs or contingent expenses incurred without our prior approval THIS WARRANTY IS EXPRESSLY IN LIEU OF ANY AND ALL OTHER WARRANTIES AND REPRESENTATIONS EXPRESSED OR IMPLIED A...

Page 4: ...tup 12 Introducing Incoming Power 12 Transmitter Burn In Period 12 Setting the Zero Signal 12 Maintenance 13 Preventive Maintenance 13 Troubleshooting 13 Replacing Components of the PPM Hydrogen Trans...

Page 5: ...n transmitter WARNING When using the 65 2443SS you must follow the instructions and warnings in this manual to assure proper and safe operation of the 65 2443SS and to minimize the risk of personal in...

Page 6: ...the detector The 1 2 NPT mounting threads at the top of the detector allow you to mount it into the bottom conduit hub of the junction box A rainshield screws onto the bottom of the detector flame ar...

Page 7: ...tor terminal strip to connect the detector to the amplifier NOTE The detector is factory wired to the detector terminal strip See page 10 for all wiring procedures related to the transmitter Span Pot...

Page 8: ...tainless steel corrosion resistant junction box allows you to install the detector at a mounting site that is remote from a controller and it protects the detector wiring connections Two conduit hubs...

Page 9: ...unting site Select a site where the transmitter is not likely to be bumped or disturbed Make sure there is sufficient room to perform start up maintenance and calibration procedures Select a site wher...

Page 10: ...hrough the top conduit hub of the junction box 7 Pull out the controller terminal strip and connect the three wires to the terminal strip as follows see Figure 4 Connect the positive wire to the PWR S...

Page 11: ...PM Hydrogen Transmitter to a Controller 12 If shielded cable is used connect the cable s drain wire to an available chassis earth ground at the controller RKI controllers typically have a ground stud...

Page 12: ...on the controller 5 Verify that the controller is on and operating properly Refer to the controller operator s manual Transmitter Burn In Period Once power has been applied to the transmitter it will...

Page 13: ...robable Causes Recommended Action Fail Condition Controller indicates a fail condition The transmitter wiring is disconnected or misconnected The transmitter is malfunctioning 1 Verify that the transm...

Page 14: ...Figure 4 on page 11 of this manual 9 Re install the detector terminal strip into its socket NOTE When a transmitter is first powered up with a new detector its output may be high enough to cause an a...

Page 15: ...Figure 4 on page 11 of this manual If controller leads or detector leads were removed during this procedure refer to Tables 4 and 5 below 8 Install the amplifier into the junction box with the screw...

Page 16: ...or the environment is not well controlled then more frequent calibration than every 6 months may be necessary Calibration This section describes how to calibrate the ppm hydrogen transmitter It inclu...

Page 17: ...program or disable external alarms before continuing Setting the Zero Reading The detector s zero setting is controlled by electronics and is not user adjustable Setting the Span Reading 1 Screw the r...

Page 18: ...18 0416RK 11 Junction box with cover stainless steel 33 2001RK 01 Humidifier tube w 3 16 tubing on ends for calibration kit 57 1070 01 Amplifier specify target gas and detection range 61 0160RK PPM h...

Page 19: ...00 ppm hydrogen calibration cylinder and 103 liter 2 000 ppm hydrogen calibration cylinder 81 F072RK LV Calibration kit includes regulator humidifier tube calibration cup 34 liter 1 000 ppm hydrogen s...

Reviews: