STEP 3-2 MAIN FRAME
Bag Contend:
1x Upper Bearing Block
1x Lower Bearing Block
2x Boom Holder
12x M2,5x8 Socket Head Bolt
1x Frame Stiffener
Check for the correct
mounting of the Bearing
Blocks.
M2,5x8(12)
Boom Holder
Lower Bearing Block
Upper Bearing Block
Frame Stiffener
A4