background image

 

 

ROOF  ASSEMBLY

 

12

 

SELECT:

 

 

3 x 1.110 m Roof Sheets

 

1 x 1.555 m Spouting

 

1 x 1.555 m Ridge

 

2 x 1.110 m Barges

 

8 x 50mm Roofing Screws

 

24 x Rivets

 

12 x 50mm Clouts

 

SIDE

 

WALL

 

FRONT 

WALL

 

BACK WALL

 

SIDE

 

WALL

 

BOTTOM PLATE

 

TOP PLATE

 

fig.1

 

STEP 1:

 

 

• 

Ensure Shed is sitting level and square.

 

 

• 

Lay Roof Sheets on the Top Plates.

 

 

• 

Rivet sheets together at overlaps with 2 x rivets per join

 

(fig.1).

 

IMPORTANT

 

Use 50mm Clouts only on outside ribs covered by Barge flashings. Predrill 
holes using a 3.5mm drill bit. Use Roofing Screws on all other ribs.

 

IMPORTANT

 

Use 50mm Clouts only on outside ribs covered by Barge flashings and back 
wall top plate. Predrill holes using a 3.5mm drill bit. Use Roofing Screws on all 
other ribs, ensuring screws are not overtightened as this can damage the seals 
and may cause the shed to leak. 

 

IMPORTANT—FOR SHEDS WITH OPTIONAL CLEAR ROOF PANEL 

 

Assemble as below, making sure that the Clear Roof Sheets overlap the stand-
ard roof sheets on both sides. Pre drill and fasten with the 50mm roofing 
screws provided.

 

 

STEP 2:

 

 

• 

Position the Roof Sheets with the back lining up with the outside 
edge of the back wall cladding as in (

fig.4)

.

 

• 

Using 4 x 50mm Clouts, predrill and nail the Roof Sheets to the Top 
Plates through the ribs, at each corner, ensuring ribs on the Roof 
Sheets line up with ribs on the Wall Sheets (

fig.2

).

 

STEP 3:

 

 

• 

Ensure the Front and Back Top Plates are straight. 

 

• 

Using 8 x 50mm  clouts, nail  the roof sheets to the  back Top Plate, 
through each rib.

 

• 

Using 8 x 50mm  roofing screws, screw the roof sheets to the  front 
Top Plate, through each rib.

 

STEP 6:

 

 

• 

Place spouting in position and rivet to Barge Flashings at each end 
and rivet to roof sheets (1 rivet per 1 sheet) 

(fig.5).

 

Pan

 

Rib

 

fig.2

 

fig.3

 

X 4

 

X 4

 

Barge

 

Spouting

 

fig.5

 

fig. 4

 

X 5

 

X 5

 

RIDGE

 

 

ROOF

 

SHEET

 

BACK 

WALL

 

STEP 4:

 

 

 

• 

Place Barge Flashings on roof at end of shed ensuring the diagonal 
trimmed end is at the front. (See diagram on pg 5)

 

 

• 

Rivet the Barge Flashings to the roof and the side wall, using four 
rivets on top of barge and four into the side (

fig.3

).

 

STEP 5:

 

 

• 

Place the Ridge in position ensuring flashing does not extend past 
side wall cladding.

 

 

• 

Rivet Ridge to roof and back wall, riveting at the ends and at each 
join of the roof sheets (

fig. 4

).

 

Summary of Contents for Smart Store SM1510

Page 1: ...ASSEMBLY INSTRUCTIONS SM1510 BASE SIZE 1 520m x 1 020m...

Page 2: ......

Page 3: ...cess needs to be adhered to to qualify for the steel warranty of your Duratuf Smart Store shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as...

Page 4: ...1 890m 1 Roof 1 110m 3 Door Sheets Narrow 1 850m 2 Door Sides 1 850m 2 Corner Door Jamb 1 890m 1 Door Jamb 1 890m 1 Door Brace 1 160m 2 Barge 1 110m 2 Spouting 1 555m 1 Door Top Bottom 0 945m 2 Hardwa...

Page 5: ...S LIST PACK 2 TIMBER PACK DESCRIPTION QTY DIAGRAM Front Back Bottom Plates H4 Green 1 520 m 2 Front Back Top Plate H1 Red 1 520 m 2 Side Wall Bottom Plates H4 Green 1 020 m 2 Side Wall Top Plates H1 R...

Page 6: ...LE FRONT PANEL 6 ASSEMBLE WALLS 7 ASSEMBLE ROOF Top Plate Back Side Wall Sheets Barge Flashing Spouting Roof Sheets 3 Sheets Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back Wa...

Page 7: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom...

Page 8: ...ttom flashings and assemble door as shown Drill and rivet as per diagram STEP 4 On the back of the door place door braces in posi tion as shown in fig 3 Ensure that the top and bottom ends of the brac...

Page 9: ...ivet sheets together on overlaps as shown STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the top of the Top Plate and the sides of the wall...

Page 10: ...ivet the sheets together on overlaps as shown STEP 3 Nail the wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the top of the Top Plate and that the sides...

Page 11: ...distance between the top and bottom plates then use a further 2 x 30mm clouts to nail the Door Jamb Flashings to the bottom Plate Pre drill holes STEP 4 Place the door on the panel In open position ap...

Page 12: ...0mm screws screw Top Plates together in the corner Using 2 x 40mm screws 2 per join screw the Bottom Plates together in the corner STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Sid...

Page 13: ...g screws provided STEP 2 Position the Roof Sheets with the back lining up with the outside edge of the back wall cladding as in fig 4 Using 4 x 50mm Clouts predrill and nail the Roof Sheets to the Top...

Page 14: ...REMOVE ALL DRILL FILINGS FROM ROOF WALLS AND CHANNELS THOROUGHLY FAILURE TO DO THIS WILL RESULT IN CORROSION AND COULD THEREFORE VOID THE WARRANTY FIT PADBOLT Rivet Padbolt to door and keeper onto Doo...

Page 15: ......

Page 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Reviews: