INSTALLATION
Installation Instructions for SIS Bus Bar Systems A2MS001EN revision R05
66 / 130
5.
Insert two flexible connectors with the bolts
through the holes on the flange connections of the bus
bars from one side.
6.
From the other side of the bus bar flange, push the
remaining flexible connectors onto the bolts.
7.
Apply (with a clean brush) a thin layer of Gleitmo
815 grease to all of the bolt threads.
Fig. 55: Bolted connection for the copper-copper connection
8.
Install the washers and nuts onto the bolts (Fig.
55) (do not tighten).
Preparing the contact springs
………….
Fig. 56: Grinding the contact springs
9.
Clean the contact spring’s contact areas with a
grinding fleece (Fig. 56).
Fig. 57: Cleaning the contact springs
10.
Clean the contact springs with acetone and a lint
free rag (Fig. 57).