18
ASSEMBLY AND
INSTALLATION
Please also refer to the illus-
trations (
I to L
) provided at the
front and back of this manual.
For more information about
installation, see also
www.ritterwerk.de/
installation-notes.
Safety instructions
To avoid personal injury or
damage to the appliance, please
observe the following safety
instructions:
– Assembly must be performed
by qualified personnel only.
ritterwerk will not be held
liable for the consequences
of improper and/or incorrect
assembly.
– The power cord must be
routed in such a way that it
is not pinched and can run
directly and without obstruc-
tion from the built-in system
to the socket to be installed in
the floor cabinet.
– Unplug the plug-in power
supply from the socket before
assembly.
I
Installation conditions
The following dimensions
represent minimum values.
– Drawer clearance width:
min. 145 mm
– Clearance height for drawer
base/crossbeam: min. 79 mm
– Pullout clearance for front
edge of worktop/inner
edge of front drawer panel:
min. 400 mm
– Depth of drawer base:
min. 434 mm
– Appliance width: 138 mm
The drawer base should be at
least 10 mm thick. The drawer
should have a static load capac-
ity of at least 30 kg.
Selecting a socket
Info:
A surface-mounted socket (that
complies with VDE/DIN 49440,
ÖVE, SEV) must be mounted
either on or behind the rear
panel at drawer height.
The power cord connection to the
socket should be routed under
the rear crossbeam or the under-
side of the work top and as high
up as possible in the corner of the
floor cabinet's rear panel.
It must be possible to slide the
drawer in fully while the plug-in
power supply is plugged into the
socket.
The plug-in power supply must
be easily accessible to the user
to ensure that the appliance can
be unplugged from the mains as
required (for example, prior to
cleaning).
I
Items for mounting included
in the delivery
18 Mounting panel
19 Grommet
20 Self-adhesive cable duct
–
4 countersunk screws
(Phillips drive, PZ 3.5 x 12)
Mounting the hand blender
K
Use a 1.5 mm drill to drill the
holes for attaching the mounting
panel (18).
• Use the screws provided to
bolt down the mounting panel.
• Clip the charging station (13)
onto the mounting panel.
• Use a metal drill (12 mm
diameter) to drill a hole in the rear
wall of the drawer. Make sure that
the cable can run parallel to the
side wall of the drawer from the
charging station to the hole.
• Insert the grommet (19) into
the hole drilled in the rear wall of
the drawer.
• Guide the power cord through
the grommet from the rear
and connect it to the charging
station.
• Shorten the cable duct (20) to
the required length and stick it to
the drawer base.
• Insert the power cord into the
cable duct and close the cable
duct.
• Connect the plug-in power
supply (15) to the mains socket.
• Bind any excess length of
power cord to the plug-in power
supply.
A
Place the contact surfaces
of the hand blender (1) onto
the contact pins of the charging
station.
L
When in the correct position,
the hand blender will feel
securely locked into place and
the LEDs on the LED display (6)
will flash.
English