MAINTENANCE
Curtain Replacement
continued
Installation
PROTECTED
AREA ON THIS
SIDE
STIFFENER, THIS SIDE
CURTAIN ATTACHED TO THE SIDE OF TUBE NEAREST SLOT
(BASKET COVERS
REMOVED FOR
CLARITY)
A
B
PROTECTED
AREA ON THIS
SIDE
STIFFENER, THIS SIDE
CURTAIN ATTACHED TO THE SIDE OF TUBE NEAREST SLOT
(BASKET COVERS
REMOVED FOR
CLARITY)
PROTECTED
AREA ON THIS
SIDE
STIFFENER, THIS SIDE
CURTAIN ATTACHED TO THE SIDE OF TUBE NEAREST SLOT
(BASKET COVERS
REMOVED FOR
CLARITY)
PROTECTED
AREA ON THIS
SIDE
STIFFENER, THIS SIDE
CURTAIN ATTACHED TO THE SIDE OF TUBE NEAREST SLOT
(BASKET COVERS
REMOVED FOR
CLARITY)
Basket shroud removed for clarity
Top View
10.00in
254mm
23.42in
595mm
CLEAR OPENING WIDTH
Protected Area
B
1 Position curtain on floor in front of basket so curtain
stiffeners (B) are closest to the primary area being
protected. The curtain is always attached to the side
of the roller tube nearest the basket entry slot (A)
2 Center curtain on tube and attach by applying
pressure to touch and hold fastener. Insert a tek
screw into each curtain strap and the roller tube.
Once the curtain is attached, place the crank on roller
tube shaft and roll the curtain on to tube
3
After curtain is wound on tube, reinsert the (5) 1/4‑20,
self threading cover mounting screws (A)
4 Rotate the basket back to a vertical position
, reengage the worm to the worm gear and
return the crank to the crank storage clip
Figure 11
Rite‑Hite
®
Installation/Service/Owner's Manual
SpanGuard
®
Mesh Safety Barrier
Publication:
AMEN00136 2019-11-22
9