![RITE-HITE LEVEL-RITE HL-800 Series Manual Download Page 6](http://html1.mh-extra.com/html/rite-hite/level-rite-hl-800-series/level-rite-hl-800-series_manual_1464571006.webp)
HL-800 HYDRAULIC DOCK LEVELER
6
Pub. No. 1167-R2 - April 2003
PIT DETAILS CONTINUED
Alternate
Junction Box
And Conduit
Location
4" x 4" x 2" NEMA 4 (By Others)
10"
ITEM 6: JUNCTION BOX LOCATION DIMENSIONS FOR HL SERIES
Preferred
Junction Box
And Conduit
Location
Minimum
1" Dia.
Conduit
Required
14"
14"
C
L
27-1/2"
90
o
11-3/4"
23-1/2"
20"
7" Typ.
6" Typ.
1-1/4"
Typ.
1/4"
Front Curb Angle
To Be Welded To
Mounting Plate
1/2" x 6"
Nelson Stud (16)
Mounting Plate
1/4" x 20" x 23-1/2"
H.R.S.
C
L
ITEM 5: RESTRAINT MOUNTING PLATE (OPTIONAL)
1"
Typ.
Restraint Mounting Plate Furnished By General Contractor Or
Available From RITE-HITE at Additional Cost.
¨
ITEM 1, 2, 3, 4: ANCHOR LAYOUT
FOR CURB ANGLES
12"
12"
IMPORTANT: Curb Angles Nelson Studs.
1/2" Dia. 6" Long Located As Shown
3"
3"
3"
12"
12"
CONSTRUCTION NOTES
1.
Concrete Behind Pit Steel Must Be Well Vibrated.
2.
Rear Pit Wall Must Be Square With Dock Floor.
3.
All Curb Angle Joints To Be Welded Securely.
4.
1/2" Pitch Toward Front Of Pit For Drainage.
5.
Both Item 4 Bumper Mountings Must Be The
Same Design.
ITEM
QTY
6L X 6W
8L X 6W
8L X 7W
1
1
74
74
85
2
1
80
80
91
3
2
60
84
84
4
2
20
20
20
CONTRACTOR'S BILL OF MATERIALS FOR NOMINAL PIT SIZES
DESCRIPTION
FRONT CURB ANGLE
3 X 3 X 3/16
REAR CURB ANGLE
3 X 3 X 3/16
SIDE CURB ANGLE
3 X 3 X 3/16
SIDE VERTICAL ANGLES
3 X 3 X 3/16
Figure - 4 Pit Details
Summary of Contents for LEVEL-RITE HL-800 Series
Page 4: ...HL 800 HYDRAULIC DOCK LEVELER 4 Pub No 1167 R2 April 2003 NOTES...
Page 45: ...HL 800 HYDRAULIC DOCK LEVELER Pub No 1167 R2 April 2003 45 NOTES...
Page 46: ...HL 800 HYDRAULIC DOCK LEVELER 46 Pub No 1167 R2 April 2003 NOTES...
Page 48: ...By Rite Hite 8900 N Arbon Dr Milwaukee Wisconsin 53223 USA 414 355 2600...