22 |
P a g e
5.
Drill 3/32” x 1-1/4” pilot holes in the center of all 5/16” diameter holes which are predrilled in the side faces of the U-
channels in the post-top 2-way elbow bracket and the wall mount bracket.
6.
Drive ¼” x 1-1/4” Lag Screw through all pilot holes you drilled using a 7/16” Socket and Ratchet Driver.