14 |
P a g e
4.
Drill 3/32” x 1-1/4” holes at the center of each 5/16” hole (four holes total, see step 2).
5.
Drive a ¼” X 1-1/4” lag screw through each pilot hole using a rachet and 7/16” socket. Tighten down all lag screws.
6.
Repeat steps 1 to 4 for all vertical posts.