6 |
P a g e
1.4
LIST OF MATERIALS THAT YOU WILL SUPPLY
This is the list of required materials which are not included in this kit. You will acquire these items locally for your project. Use
this table to help you calculate your total project budget.
Item Description
Item Qty
Item Cost
($)
Total Item
Cost ($)
Item Image
4x4 Post Lumber (You determine length)
6
NA
4x4 Header Lumber (You determine length)
6
NA
1/2” X 2-3/4” (1/2-13 threads) Vibration Resistant
Hammer-On Stud Anchor for Concrete.
McMasterCarr.com SKU
92188A305
24
3/8” x 3” Lag Screws (for deck mounting).
McMasterCarr.com SKU 92351A636
24
Tape, for marking drill bit depth
2”
NA
Grand Total Cost ($)
NA