![Rinnai SLIMFIRE 252 Operation & Installation Manual Download Page 22](http://html1.mh-extra.com/html/rinnai/slimfire-252/slimfire-252_operation-and-installation-manual_1462662022.webp)
Rinnai Australia
19
Slimfire 252 Operation & Installation Manual
HEATER ENGINE INSTALLATION - MASONRY
Step 4.
Positioning the Heater Engine
Place the heater engine in front of the fireplace enclosure.
Step 5.
Connect Electrical Supply
Plug in the 3 pin connector if electrical connections inside the
fireplace.
Step 6.
Insert Heater Engine Into Fireplace
Carefully move the heater engine into the fireplace ensuring
the gas supply pipe and fittings
feed into the rear access
hole.
Step 7.
Connecting Gas
Connect gas supply pipe and fittings
to the gas control
valve inlet
and tighten.
Step 8.
Leak Testing
Turn gas back ON and leak test all appliance connections.
Step 9.
Securing The Heater Engine
Fasten the heater to the masonry work using appropriate
fasteners (not supplied) using the three holes across the top of
the fascia assembly mounting panel and in at least two of the
holes on each side of the side panels as shown
.
Step 10. Completing Heater Installation
Go to “COMPLETING HEATER INSTALLATION” on page 23.
A panel from the cardboard packing carton
placed on the floor underneath the heater will
help prevent possible damage to flooring.
Take care that the electrical cord does not bunch
up or get pinched behind the heater engine.
Use a soapy solution to test all gas connections.
If a leak is present bubbles will form at the leak
point. When finished remove any residue with a
rag. Prevent any soapy solution from coming in
contact with electrical components.
E
G
E
F
F
E
HINT
E
CAUTION
E
F
CAUTION
G