![Rinnai RHEPM11530N Modulating Supplemental Manual Download Page 27](http://html1.mh-extra.com/html/rinnai/rhepm11530n/rhepm11530n_modulating-supplemental-manual_1462649027.webp)
27
HE+ Series Modulating Supplemental Manual
12. START
-
UP / COMMISSIONING SHEET
COMMISSIONING REPORT
CONTRACTOR NAME: ................................................................................DATE................................
ADDRESS:............................................................................................................................................
............................................................................................................................................................
CITY:........................................................................................
PHONE:...................................................................................
CELL: .....................................................................................
JOB SITE......................................................................................................CITY................................
HEATER MODEL NUMBER:............................................................................................................
HEATER SERIAL NUMBER: ...........................................................................................................
FAX COMPLETED FORM TO TECHNICAL SERVICES: CANADA - 905-712-8336 USA - 706-554-9390
START-UP NEEDS TO BE COMPLETED BY THE LICENSED GAS INSTALLER.
ALLEVIATE NUISANCE CALL BACKS FOR THE CONTRACTOR, THE FOLLOWING
A CONTRACTOR IS CALLING FOR TECHNICAL SUPPORT,
MUST PROVIDE THE FOLLOWING INFORMATION
FROM HIS COMPLETED COMMISSIONING REPORT ON NEXT PAGE
AS PER I&O MANUAL AND LOCAL CODES
IT IS NOT A PLUG IN APPLIANCE..IT DOES REQUIRE COMMISSIONING AND FIELD ADJUSTMENTS
THIS EQUIPMENT HAS BEEN FACTORY FIRED AND TESTED BEFORE DELIVERY, NEVERTHELESS
TO ENSURE THAT SITE CONDITIONS ARE COMPATIBLE WITH THIS HEATER, AND TO
THIS EQUIPMENT HAS BEEN FACTORY FIRED AND TESTED PRIOR TO SHIPMENT. HOW-
EVER, THIS APPLIANCE IS NOT
“
PLUG & PLAY
”.
IT REQUIRES COMMISSIONING AND
FIELD ADJUSTMENT / SPECIFICATIONS CONFIRMATION TO ENSURE SAFE AND EFFI-
CIENT OPERATION.
TO ENSURE THAT SITE CONDITIONS ARE COMPATIBLE WITH THE HEATER
’
S PERFORMANCE, THE
FOLLOWING START
-
UP NEEDS TO BE COMPLETED BY THE QUALIFIED GAS INSTALLER.
WARNING
START UP
‘
SMOKE
’
During start up, material coatings used in the production process of tubes and reflectors will
“
burn off
”
and create smoke during the first hour of operation. This is temporary and normal.
Please ensure that there is sufficient ventilation to adequately clear the smoke from the space.
Notify site and safety personnel to ensure that alarm systems are not unduly activated.
Located on burner rating plate
Located on burner rating plate