1.  Determine the most suitable position, refer "Location" on page 3.
2. 

Mark and drill 3 holes (mounting and cable access) as per the dimensions (mm) below.

3.  When running cable through the access hole ensure the connector end of the cable is located nearest to the 

water controller (Fig. 1).

4. 

Carefully remove the cover plates from the water controller, using a screw driver (Fig. 2).

5.  Connect the cable to the water controller. Feed any excess cable lengths into the wall cavity to avoid the 

pinching of cables between the wall and the water controller.

6.  Fix the water controller to the wall using the appropriate fixings (Fig. 3). 
7.  Remove protective film from the water controller face and replace the cover plates (Fig. 4).

Optional Programming For Universal Water Controllers (MC-601Q)

QUESTION

?

Are there four water controllers connected?

IF NO:

You have three (or fewer) water controllers, go to Question 2.

IF YES:

You will need to activate the fourth water controller as follows:

STEP 1:

For the water controller in the KITCHEN ONLY, press and hold the ‘Priority 

Transfer’ and ‘On/Off’ buttons simultaneously (see Fig. 1) until a ‘beep’ is heard 

(approximately 5 seconds).

STEP 2:

Check that the display on ALL FOUR water controllers is lit and displaying a 

temperature when ‘switched on’. If any ONE of the water controllers displays 

two dashes (see Fig. 2) repeat STEP 1.
This completes the activation procedure for the fourth water controller, you 

may ignore Question 2.

QUESTION

?

Is the water heater marked to state it delivers water not exceeding 50°C?

IF YES:

No further action required.

IF NO:

You will need to program the kitchen water controller to enable selection of 

temperatures higher than 50°C.

STEP 1:

For the water controller in the KITCHEN ONLY, press and hold the ‘Priority 

Transfer’ and ‘On/Off’ buttons simultaneously (Fig. 3) until a ‘beep’ is heard 

(approximately 5 seconds).

STEP 2:

When the water controller fitted in the KITCHEN is switched On, it should be 

possible to select temperatures higher than 50°C. If not, repeat STEP 1.

NOTE

If the water controller in the kitchen is replaced, repeat 

STEP 1

 for the replacement controller.

If the water controller in the kitchen is swapped with another water controller (for example, the 

water controller fitted in a bathroom), repeat 

STEP 1

 for the water controller moved from the 

kitchen to the bathroom. Then perform 

STEP 1

 for the water controller moved from bathroom 

to the kitchen.

Connector

Controller Cable

Screws

Film

Fig. 1

Dimensions

Fig. 2

Fig. 3

Fig. 4

Cover

Plates

90

120

Ø20

84

Centre

Fig. 1

Fig. 2

Fig. 3

INSTALLATION

Summary of Contents for MC-601Q

Page 1: ...ll deliver the selected temperature even when the water flow is varied or more than one tap is in use Only one MC model water controller can be designated as a Master water controller and this is normally used in the kitchen All the remaining water controllers are designated as Sub water controllers and are for use in bathrooms toilets and laundries The maximum temperature limit for all Sub water ...

Page 2: ...ous Flow Water Heaters Operation Installation Manual Transferring Priority To control the water delivery temperatures when using two or more water controllers it is necessary to have priority transferred to the water controller you wish to use Transferring of priority will NOT be possible if the In Use indicator is currently illuminated as this indicates hot water is flowing and that another water...

Page 3: ...on cables may be used Optional longer communication cabling is available from Rinnai The water heater end of the cables are fitted with spade terminals Only two pairs of cables 4 spade connectors in total may be terminated When attaching three or four cables it is necessary to join the cable terminals as follows For each pair cut off the existing spade connectors and re terminate each pair into a ...

Page 4: ...ximately 5 seconds STEP 2 Check that the display on ALL FOUR water controllers is lit and displaying a temperature when switched on If any ONE of the water controllers displays two dashes see Fig 2 repeat STEP 1 This completes the activation procedure for the fourth water controller you may ignore Question 2 QUESTION 2 Is the water heater marked to state it delivers water not exceeding 50 C IF YES...

Reviews: