Energysaver RHFE-308 FTR
- 40 -
©Rinnai
22. Testing
Test Mode Summary
Test Mode 1 -
This mode cancels temperature control, and starts combustion mode.
Test Mode 2 -
This mode controls the modulating valve and convection fan (Normally, this test
mode is used when converting gas type and changing the PCB).
* Operating Procedures and Indicator
(A) Test Mode 1
Note:
Indicators (digital display “00" and “22", “24", “26" and “HIGH” indicators) show that
modulating valve and/or convection fan adjustment is complete.
Digital Display
The indicators will be off when the PCB unit is replaced.
Indicators will illuminate after test mode 2 adjustment is completed.
2. Indicators (digital display “LO”, “Cu”, “Hi” and “LO”, “16", “18", “20" indicators) may be flashing
at times. This means the combustion mode is in transition (eg. Changing from LOW
→
MED). The
indicators will glow steadily once combustion mode stabilises.
(B) Test Mode 2
(Adjusting Modulating Valve)
See “Gas Pressure Setting Procedure” on pag e43.
Operating Procedures
Illuminated Indicators
1. Turn the appliance on (combustion indicator illuminates).
Press test mode switch (SW 5) at top of the PCB (combustion
mode changes to “Low” test mode).
LOW
2. Change combustion and convection fan mode using the
Temperature/Time setting switch located on the control
panel.
The mode changes from LOW
→
MED
→
HIGH each
time the “/\” switch is pressed.
The mode changes HIGH
→
MED
→
LOW each time the
“\/” switch is pressed.
MEDIUM
HIGH
3. Return operation to normal by pressing the test mode switch
(SW 5) again.
Displays temperature.
Sections of the digital display show that the
following adjustments have been completed:
1) Modulating Valve (LOW)
2) Modulating Valve (HIGH)
3) Convection Fan (LOW)
4) Convection Fan (HIGH)
Summary of Contents for ENERGYSAVER RHFE-308FTR
Page 1: ... ENERGYSAVER RHFE 308FTR High Efficiency Power Flued Gas Space Heater SERVICE MANUAL ...
Page 7: ...Energysaver RHFE 308 FTR 2 Rinnai 2 Dimensions Note All dimensions are in millimetres ...
Page 9: ...Energysaver RHFE 308 FTR 4 Rinnai 4 Cut Away Diagram ...
Page 15: ...Energysaver RHFE 308 FTR 10 Rinnai 7 Schematic Diagram ...
Page 27: ...Energysaver RHFE 308 FTR 22 Rinnai 14 Wiring Diagram ...
Page 28: ...Energysaver RHFE 308 FTR 23 Rinnai 15 Block Diagram ...
Page 29: ...Energysaver RHFE 308 FTR 24 Rinnai 16 Time Charts ...
Page 30: ...Energysaver RHFE 308 FTR 25 Rinnai ...
Page 31: ...Energysaver RHFE 308 FTR 26 Rinnai ...
Page 55: ...Energysaver RHFE 308 FTR 51 Rinnai 26 Exploded Diagram ...
Page 56: ...Energysaver RHFE 308 FTR 52 Rinnai ...
Page 57: ...Energysaver RHFE 308 FTR 53 Rinnai ...
Page 58: ...Energysaver RHFE 308 FTR 54 Rinnai ...
Page 59: ...Energysaver RHFE 308 FTR 55 Rinnai ...