30
7-3.Replacement of sensor and parts
7-4.Treatment when operation is stopped or its installation place is
moved.
7-4-1.Stop at normal operation
Make the power switch off on the front panel.
Make the power (DC24V) off at the supply side.
7-4-2.Installation when move its place
When move its place, refer to 「4-3. Installation place」 about its moving place. Then, for wiring refer to
「4-6. Wiring」.
7-5.Storage and treatment when not use for a long time
This model must be stored under the following environmental conditions.
・In a dark place under the normal temperature and humidity away from direct sunlight.
・In a place where gases, solvents or vapors are not present.
8.SCRAP OF PRODUCT AND SENSOR
Scrap of products
・Regarding indicator/alarm unit and detector head complete, treat it in the same as industrial scrap
(Non-flammable goods).
CAUTION
When move its installation place, be sure to make gas calibration. The re-adjustment
work including gas calibration shall be requested to contact our service agent or RIKEN
KEIKI.
CAUTION
・When re-use it, be sure to make gas calibration.
・ The re-adjustment and parts replacement etc including the gas calibration shall be
contacted to our nearest agent or RIKEN KEIKI.
CAUTION
For replacement of sensors and parts etc, contact our service agent or RIKEN KEIKI.