T
I
+44 (0)1926 290 418 E
I
I
www.rigtec.com
11
STACKING
Air Frames can be stacked together for use as a ground stack on a flat
surface or a suspended stack from a truss. To stack frames together,
choose a safe, even and suitable surface and follow these instructions:
1.
Lower one frame down on to the other ensuring the four male
stacking connectors of one frame locate inside the four female
stacking connectors of the lower frame.
2.
Once the frames are connected; remove the tethered locking pins
from their storage positions by pushing the button to release the
pins. Whilst pushing and holding the button in, position the
locking pin through the hole in the side of the female stacking
connector, ensuring it goes all the way through the male stacking
connector and out the other side of the female stacking
connector.
3.
Step 2 must be completed for all 4 stacking connectors to safely
lock the stacked frames together.
ENSURE all four locking pins are securely positioned through the
adjoining male and female Air Frame stacking connectors.
Care should be taken when lifting and moving Air Frames with
Projectors installed –
the combined weight of the device and any
accessory should be within safe manual handling limits.
1
2
3