background image

Installation Guide

 

 

RIGOL 

1.

 

Remove the four rubber protective covers located at the corners of the front panel 
and the four ones at the corners of the rear panel of the instrument respectively. 

 
2.

 

Attach two rails (with the U-channel 
facing outward) to both sides of the 
bottom plate, and then fasten them 
with eight M4 screws. 

 

3.

 

Attach two side beam fasteners to 
the front ends of each rail, as shown 
in the figure below, and then secure 
them with four M4 screws. 

 

4.

 

Secure the side beam fasteners to the 
cabinet by using four M6 screws and 
four M6 nuts. 

 

5.

 

Attach another two side beam 
fasteners to the back ends of each 
rail respectively, as shown in the 
figure below, and then secure them 
with four M4 screws. Use four M6 
screws and four M6 nuts to secure 
the side beam fasteners to the 
cabinet. 

 

6.

 

Attach the left fastener to the left side 
of the instrument, and secure it with 
two M4 screws. 

7.

 

Attach one filler panel to the right 
side of the instrument, and secure it 
with two M4 screws. 

 

Installation Guide

 

 

RIGOL 

 

8.

 

Attach another filler panel to the right side of the first installed filler panel, and 
secure it with two M4 screws. 

9.

 

Attach the right fastener to the right side of the second filler panel, and secure it with 
two M4 screws. 

10.

 

Place the assembled instrument and rack onto the bottom plate. Then, secure the 
left and right fasteners to the cabinet with four M6 screws and four M6 nuts. 

 

 

-End- 

Reviews: