![RightAngle R-Style 53493 Installation Download Page 2](http://html1.mh-extra.com/html/rightangle/r-style-53493/r-style-53493_installation_1460767002.webp)
K&A Manufacturing • 800.298.4351 • www.raproducts.com/install
2 of 2
R-Style Optional Series 4 HV Monitor Lift
Wire Management Channel Installation
Warranty: raproducts.com/warranty
#53493
• Lay the kick panel on a protected surface with the slim fix bolts and pilot holes facing up.
• Align the holes in the wire management channel(s) with the pilot holes in the kick panel.
• Attach the channel(s) with four wood screws in each channel.
Do not over-tighten the screws.
Use a low torque
setting on the driver.
• Continue the assembly of the workstation using the instructions that came with it.
• Workstation with wider than 48” will require two wire management channels.
D. M5 x 18mm (7/8”) Sq/Ph/Washer Head Wood Screw
x8
E. 5mm Slim Fix Bolt
x8
Tools Required for Assembly
A. Power Driver with Adjustable Torque
B. #2 Phillips Head Driver Bit
C. #2 Square Head Drive Bit
(Recommended)
A
B
C
Hardware Included for Assembly
(may have extra)
F. HV Series 4 Kick Panel 72
x1
G. 26” Wire Management Channel - HV Series
x2
Parts
Installation
F
G
D
E