RightAngle R-Style 53493 Installation Download Page 1

K&A Manufacturing  •  800.298.4351  •  www.raproducts.com/install

1 of 2

R-Style Optional Series 4 HV Monitor Lift  
Wire Management Channel Installation 

 

Warranty: raproducts.com/warranty 

#53493

D.    M5 x 18mm (7/8”) Sq/Ph/Washer Head Wood Screw 

x4

E.  5mm Slim Fix Bolt 

x8

Tools Required for Assembly

A.   Power Driver with Adjustable Torque
B.   #2 Phillips Head Driver Bit
C.   #2 Square Head Drive Bit 

(Recommended)

 

A

B

C

Hardware Included for Assembly 

(may have extra)

D

E

F.   HV Series 4 Kick Panel 36 

x1

G.   26” Wire Management Channel - HV Series 

x1

Parts

F

Installation

•  Lay the kick panel on a protected surface with the 

slim fix bolts and pilot holes facing up. 

•  Align the holes in the wire management channel(s) 

with the pilot holes in the kick panel. 

•  Attach the channel(s) with four wood screws in each 

channel. 

Do not over-tighten the screws. 

Use a 

low torque setting on the driver.

•  Continue the assembly of the workstation using the 

instructions that came with it.

D

E

F

G

Reviews: