10
STEP 6
TURN THE BOLTS AT THE TOP OF THE CASTERS CLOCKWISE TO LEVEL THE UNIT.
(FROM THE TOP) ON THE LOW CORNERS OF THE UNIT. IF YOUR WORKSTATION HAS CASTERS,
LOCATION. LEVEL THE WORKSTATION BY TURNING THE LEVELING GLIDES CLOCKWISE
WITH THE HELP OF AN ASSISTANT, SET THE WORKSTATION UPRIGHT IN ITS FINAL
9
STEP 11:
CROSS SUPPORTS ARE
NOT SHOWN ON THESE
VIEWS SO OTHER COM-
PONENTS ARE VISIBLE.
8
STEPS 7-9
LEVELING GLIDE
OR CASTER
9
13
12
14
11
11
1
6703 ZINSER ST., SCHOFIELD, WI 54476
PHONE: 800.298.4351 FAX: 866.882.9475
www.raproducts.com
VERSION DATED: 7/18/12
K&A MANUFACTURING
PAGE 2 OF 3
SWITCH
AS SHOWN ON THE WIRING DIAGRAM BELOW.
STEP 6:
PLACE THE MOVABLE WORKSURFACE
9
ON THE PROTECTED SURFACE IN FRONT OF THE FIXED
WORKSURFACE
1
KEEPING A 1/2" SPACE BETWEEN THE WORKSURFACES. PLACE THE SWING ARM
10
ON
THE WORKSURFACES AS HOWN. ALIGN THE HOLES IN THE SWING ARM AND RELEASE PADDLE WITH THE PILOT
HOLES IN THE WORKSURFACES. ATTACH THEM USING THE INSTRUCTIONS THAT CAME WITH THE ARM. THE
SCREWS ARE INCLUDED WITH THE ARM.
STEP 7:
ALIGN THE HOLES IN THE HAND SWITCH
14
WITH THE PILOT HOLES IN THE MOVABLE WORKSURFACE
9
.
ATTACH THE SWITCH WITH (2) RECEX DRIVE SCREWS
11
.
STEP 8:
ALIGN THE HOLES IN THE CONTROL BOX
13
WITH THE PILOT HOLES IN THE FIXED WORKSURFACE
1
.
ATTACH THE CONTROL BOX WITH (2) RECEX DRIVE SCHOOLS
11
.
STEP 9:
ATTACH (3) WIRE MANAGEMENT J'S
12
IN THE LOCATIONS SHOWN USING (3) WOOD SCREWS
8
.
PILOT HOLES ARE NOT PROVIDED. ON 60" AND 72" WORKSTATIONS, THE (2) WIRE MANAGEMENT J'S NEAR
THE BACK ARE REPLACED WITH A U-CHANNEL.
STEP 10:
RUN THE WIRES THROUGH THE WIRE MANAGEMENT J'S
12
AS SHOWN ON THE WIRE RUNS DIAGRAM
BELOW. IF YOUR WORKSTATION HAS A U-CHANNEL, RUN THE WIRES THROUGH IT. PLUG THE WIRES INTO THE
RECEPTACLES ON THE CONTROL BOX
13
RH COLUMN
SWITCH
WIRE RUNS
WIRE
RIGHT COLUMN WIRE
HAND SWITCH WIRE
HAND
LEFT COLUMN
WIRE
STEP 10
LH COLUMN
WIRING DIAGRAM
HS
M1
M2
13