COLUMN 1 WIRE
STEP 9
RUN WIRING IN THE WIRE MANAGEMENT J
SHOWN HERE FOR CLARITY.
AND THE U-CHANNELS WHICH ARE NOT
HAND SWITCH WIRE
WIRE RUNS DIAGRAM
COLUMN 2 WIRE
HAND SWITCH
COLUMN 1
COLUMN 2
9
12
13
11
M1
10
STEPS 6-8
PAGE 2 OF 3
VERSION DATED 1/20/14
STEP 6:
ALIGN THE HOLES IN THE CONTROL BOX
11
AND THE HAND SWITCH
12
WITH THE PILOT HOLES IN THE
WORKSURFACE
6
. ATTACH THEM WITH (4) WOOD SCREWS
9
. THESE COMPONENTS CAN BE MOVED IF
REQUIRED.
STEP 7:
ALIGN THE HOLES IN THE U-CHANNELS
10
WITH THE PILOT HOLES IN THE WORKSURFACE
6
. ATTACH
THEM WITH( 20-24) WOOD SCREWS
9
.
STEP 8:
ATTACH THE WIRE MANAGEMENT J
13
AT THE LOCATION SHOWN USING (1) WOOD SCREW
9
. NO
PILOT HOLE IS PROVIDED.
STEP 9:
PLUG THE WIRE FROM THE HAND SWITCH INTO THE HS RECEPTACLE ON THE CONTROL BOX
11
. PLUG
THE MOTOR WIRES INTO THE CABLES AND PLUG THE OTHER ENDS INTO THE M1 AND M2 RECEPTACLES ON THE
CONTROL BOX.
STEP 10:
WITH THE HELP OF AN ASSISTANT, SET THE TABLE UPRIGHT IN ITS FINAL LOCATION. LEVEL THE TABLE IF
NECESSARY BY TURNING THE LEVELER GLIDES CLOCKWISE (FROM THE TOP) ON THE LOW CORNERS OF THE
TABLE. IF YOUR TABLE HAS CASTERS, LEVEL IT BY TURNING THE BOLTS AT THE TOP OF THE CASTERS.
HS
M2
WIRING DIAGRAM
6703 ZINSER ST., SCHOFIELD, WI 54476
PHONE: 800.298.4351 FAX: 866.882.9475
www.raproducts.com
K&A MANUFACTURING