RightAngle NewHeights 4 XT Series Assembly Instructions Download Page 2

COLUMN 1 WIRE

STEP 9

RUN WIRING IN THE WIRE MANAGEMENT J

SHOWN HERE FOR CLARITY.

AND THE U-CHANNELS WHICH ARE NOT

HAND SWITCH WIRE

WIRE RUNS DIAGRAM

COLUMN 2 WIRE

HAND SWITCH

COLUMN 1

COLUMN 2

9

12

13

11

M1

10

STEPS 6-8

PAGE 2 OF 3

VERSION DATED 1/20/14

STEP 6:  

ALIGN THE HOLES IN THE CONTROL BOX  

11

  AND THE HAND SWITCH  

12

  WITH THE PILOT HOLES IN THE

WORKSURFACE  

6

  .  ATTACH THEM WITH (4) WOOD SCREWS  

9

  .  THESE COMPONENTS CAN BE MOVED IF

REQUIRED.

STEP 7:  

ALIGN THE HOLES IN THE U-CHANNELS  

10

  WITH THE PILOT HOLES IN THE WORKSURFACE  

6

  .  ATTACH

THEM WITH( 20-24) WOOD SCREWS  

9

  .

STEP 8:  

ATTACH THE WIRE MANAGEMENT J  

13

  AT THE LOCATION SHOWN USING (1) WOOD SCREW  

9

  .  NO

PILOT HOLE IS PROVIDED.

STEP 9: 

PLUG THE WIRE FROM THE HAND SWITCH INTO THE HS RECEPTACLE ON THE CONTROL BOX  

11

  .  PLUG

THE MOTOR WIRES INTO THE CABLES AND PLUG THE OTHER ENDS INTO THE M1 AND M2 RECEPTACLES ON THE
CONTROL BOX.

STEP 10:  

WITH THE HELP OF AN ASSISTANT, SET THE TABLE UPRIGHT IN ITS FINAL LOCATION.  LEVEL THE TABLE IF

NECESSARY BY TURNING THE LEVELER GLIDES CLOCKWISE (FROM THE TOP) ON THE LOW CORNERS OF THE 
TABLE.  IF YOUR TABLE HAS CASTERS, LEVEL IT BY TURNING THE BOLTS AT THE TOP OF THE CASTERS.

HS

M2

WIRING DIAGRAM

6703 ZINSER ST., SCHOFIELD, WI 54476

PHONE: 800.298.4351 FAX: 866.882.9475

www.raproducts.com

K&A MANUFACTURING

Reviews: