RightAngle NewHeights 4 XT Series Assembly Instructions Download Page 1

SUPPORT

WORKSURFACE 

9

8

4

5

7

1

STEPS 2-5

6

READ ALL THE INSTRUCTIONS

BEFORE BEGINNING.  DO NOT

OPERATE THE UNIT UNTIL IT IS

FULLY ASSEMBLED

1

3

4

5

2

DETAIL A

7

 4.000 

PRE-INSTALLED
WELD NUT

6703 ZINSER ST., SCHOFIELD, WI 54476

PHONE: 800.298.4351 FAX: 866.882.9475

www.raproducts.com

K&A MANUFACTURING

PAGE 1 OF 3

VERSION DATED:  1/20/14

TOOLS REQUIRED FOR ASSEMBLY:

CORDLESS DRILL
#2 PHILLIPS HEAD DRIVER BIT
#2 SQUARE HEAD DRIVER BIT
7/32" HEX HEAD DRIVER BIT OR
ALLEN WRENCH
TAPE MEASURE
LEVEL

NewHeights SERIES 4 XT CONFERENCE TABLE ASSEMBLY INSTRUCTIONS:

STEP 1:  

DO NOT ALLOW THE LEG ASSEMBLIES TO STAND WITHOUT SUPPORT.

THEY CAN TIP OVER AND THE GEAR HOUSING COULD CRACK.  PLACE (2) 
LOCK WASHERS  

4

  ON (2) SOCKET SCREWS  

5

  .  INSERT THESE THROUGH THE 

HOLES IN THE LEFT SUPPORT BRACKET  

3

  AND THREAD THEM INTO THE WELD 

NUTS INSIDE THE MOTOR BOX.  DO NOT FULLY TIGHTEN.  REPEAT 

STEP 1

 WITH

THE RIGHT SUPPORT BRACKET AND THEN REPEAT THIS STEP WITH THE SECOND 
LEG ASSEMBLY.

STEP 2:  

LAY THE WORKSURFACE  

6

  ON A PROTECTED SURFACE WITH THE PILOT 

HOLES FACING UP.  ALIGN THE HOLES IN THE WORKSURFACE SUPPORTS AND
THE SUPPORT BRACKETS WITH THE PILOT HOLES IN THE WORKSURFACE.  WITH 
THE HELP OF AN ASSISTANT, PLACE (4) LOCK WASHERS  

4

  ON (4) SOCKET 

SCREWS  

5

  .  INSERT THESE THROUGH THE HOLES AT THE ENDS OF THE CROSS 

SUPPORT  

7

  AND THREAD THEM INTO THE WELD NUTS PRE-INSTALLED IN THE 

GROOVES ON THE LEG ASSEMBLIES  

1

  .  SEE DETAIL AT LEFT.

STEP 3:  

LEVEL THE CROSS SUPPORT  

7

  AT 4" FROM THE BOTTOM OF THE WORK-

SURFACE SUPPORTS AND FULLY TIGHTEN THE SOCKET SCREWS  

5

  .  SEE DETAIL A.

INSERT AN END CAP  

8

  INTO EACH END OF THE CROSS SUPPORT.  REPEAT

STEPS 2 AND 3

 WITH THE OTHER CROSS SUPPORT.  

STEP 4:  

ATTACH THE LEG ASSEMBLIES  

1

  TO THE WORKSURFACE USING (16) 

WOOD SCREWS  

9

  .  FULLY TIGHTEN.  DO NOT OVER-TIGHTEN THE SCREWS.

USE A LOW TORQUE SETTING ON THE DRILL.

STEP 5:  

FULLY TIGHTEN THE (8) SOCKET SCREWS  

5

  THAT ATTACH THE SUPPORT

BRACKETS  

2

  AND  

3

  TO THE MOTOR BOXES.

INSTRUCTION #  53219

HARDWARE PACK # 53218

ITEM # PART #

DESCRIPTION

QTY.

1

VARIES XT CENTERED LEG

2

2

801131 XT MOTOR BOX SUPPORT ANGLE RIGHT

2

3

801132 XT MOTOR BOX SUPPORT ANGLE LEFT

2

4

53025 5/16 LOCK WASHER

16

5

53024 5/16-18 x 1/2 BUTTON HEAD SOCKET SCREW 

16

6

VARIES CONFERENCE TABLE WORKSURFACE

1

7

VARIES SERIES 4 CROSS SUPPORT

2

8

800934 CROSS SUPPORT END CAP

4

9

51708 M5 x 18mm SQ/PH/WSHR HEAD WOOD SCREW  VARIES

10

VARIES U-CHANNEL

2

11

50298 NewHeights CONTROL BOX

1

12

50285 NewHeights HAND SWITCH

1

17

51951 WIRE MANAGEMENT J

1

STEP 1

Reviews: