ITEM # PART #
DESCRIPTION
QTY.
A
Varies Track Assembly
1
B
52336 3/16" Aluminum Rivet Washer .198 x .510 x .067
2
C
52678 8-18X1/2 Phillips Pan Self Drill Screw
2
D
51708 M5 x 18mm (7/8") Sq/Ph/Wshr Head Wood Screw
2
E
Varies LT U-channel
1
Page 8 OF 8
K&A Manufacturing
6703 Zinser Street Schofield, WI 54476
Phone: 800.298.4351
Fax: 866.882.9475
www.raproducts.com
Instructions To Install a Track on a Series 4 LT
Workstation:
Step 1:
Place the front of the track
A
against the bottom of the worksurface and the back
of the track on the angled part of the u-channel.
Step 2:
Align the holes in the track
A
with one set of pilot holes in the u-channel
E
keeping the front of the track 1/8"-5/8" from the front of the worksurface. Place (2) washers
B
on (2) self drilling screws
C
. Drive them through the track and into the u-channel.
Step 3:
Attach the front of the track
A
to the worksurface using (2) wood screws
D
. Do
not over-tighten the screws. Use a low torque setting on the power driver.
Step 4:
Complete the installation using the instructions that came with the product you are
installing.
Instruction # 53322
Warranty Information:
NewHeights™ products are warranted to be free of defects due
to manufacturing or materials as follows. 5 years on the support brackets, aluminum
columns, and feet. We will replace any defective part after inspection by an authorized
agent. Costs incurred due to product replacement such as installation labor or trans-
portation are not covered under this warranty.
Step 11:
With the help of an assistant, set the work-
station upright in its final location. Level the workstation
if required by turning the leveling glides clockwise (from
the top) on the low corners of the unit. If your workstation
has casters, level it by turning the bolts at the top of the
casters.
Side View
(Track will be
at an angle when
installation is finished)
A
B
C
D
E
A
E