CORDLESS DRILL WITH
7/32" HEX HEAD DRIVER BIT OR
VERSION DATED: 3/30/12
OR #2 SQUARE HEAD DRIVER BIT
#2 PHILLIPS HEAD DRIVER BIT
INSTRUCTION # 52644
LEVEL
TAPE MEASURE
PAGE 1 OF 3
TOOLS REQUIRED FOR ASSEMBLY:
HARDWARE PACK # 52226 PLUS CENTER LEG BRACKET HARDWARE
ALLEN WRENCH
ITEM # PART #
DESCRIPTION
QTY.
1
VARIES WORKSURFACE(S)
VARIES
2
VARIES 42" OR 54" U-CHANNEL
VARIES
3
800382 35UP 3x5 WORKSURFACE JOINER PLATE
1
4
51708 M5 x 18mm SQ/PH/WSHR HEAD WOOD SCREW VARIES
5
VARIES NewFixed COLUMN ASSEMBLY LEFT HAND
1
6
VARIES NewFixed COLUMN ASSY 3-LEGGED CENTER
1
7
VARIES NewFixed COLUMN ASSEMBLY RIGHT HAND
1
8
VARIES NewHeights 3-LEG CROSS SUPPORT BRACKET
1
9
VARIES NewHeights CROSS SUPPORT 3-LEG
2
10
52477 3/8 INTERIOR TOOTH STAR WASHER
VARIES
11
52470 3/8-16 x 3/8 BUTTON HEAD SOCKET SCREW
VARIES
12
800411 NewHeights/HOVER END CAP
4
13
52498 7/32" ALLEN WRENCH
1
NewFixed™ 3-LEG WORKSTATION ASSEMBLY INSTRUCTIONS:
STEP 1:
LAY THE WORKSURFACE(S)
1
ON A PROTECTED SURFACE WITH THE
PILOT HOLES FACING UP. IF YOUR WORKSTATION HAS U-CHANNEL(S)
2
, AND/
OR JOINER PLATE(S)
3
, ATTACH THEM AS FOLLOWS. IF NOT, PROCEED TO
STEP 4
.
STEP 2:
U-CHANNELS
2
ARE INCLUDED ON 72" AND LARGER WORKSTATIONS.
ALIGN THE HOLES IN THE U-CHANNELS WITH THE PILOT HOLES IN THE WORK-
SURFACE(S)
1
. ATTACH THE U-CHANNEL(S) TO THE WORKSURFACE(S) WITH
(10) WOOD SCREWS
4
ON THE 42" U-CHANNEL OR (12) WOOD SCREWS ON
THE 54" U-CHANNEL. DO NOT OVER-TIGHTEN THE SCREWS. USE A LOW
TORQUE SETTING ON THE DRILL.
STEP 3:
CENTER THE JOINER PLATE(S)
3
ON THE SEAM BETWEEN THE WORK-
SURFACES
1
AND 3" FROM THE EDGE(S) OF THE WORKSURFACES. NO
PILOT HOLES ARE PROVIDED FOR THE JOINER PLATE(S). ATTACH TO THE
WORKSURFACES WITH (8) WOOD SCREWS
4
IN EACH JOINER PLATE.
6703 ZINSER ST., SCHOFIELD, WI 54476
PHONE: 800.298.4351 FAX: 866.882.9475
www.raproducts.com
K&A MANUFACTURING
2
4
4
1
3
BEFORE BEGINNING
READ ALL THE INSTRUCTIONS
STEPS 1-3
YOU MAY HAVE (2) JOINER PLATES