RightAngle 415NR Installation Instructions Download Page 2

PAGE 2 OF 3

VERSION DATED:  10/4/11

STEP 5:  

PLACE THE NOTEBOOK TRAY  

6

  ON THE ARTICULATING ARM  

2

  ALIGNING THE HOLES 

IN THE TRAY WITH THE HOLES IN THE ARM.  INSERT (6) MACHINE SCREWS  

7

  THROUGH THE 

HOLES IN THE TRAY & THE ARTICULATING ARM.  

STEP 6:  

THREAD (6) FLANGE NUTS  

8

  ONTO THE MACHINE SCREWS  

7

  & TIGHTEN.

STEP 7:  

ADJUST THE TRAY TO THE DESIRED POSITION.  SEE PAGE 3 OF 3. 

6703 ZINSER ST., SCHOFIELD, WI 54476

PHONE: 800.298.4351 FAX: 866.882.9475

www.raproducts.com

K&A MANUFACTURING

7

6

2

8

STEPS 5-7

Reviews: