STEP 1
E
3
F
G
PARTS LIST
2
STEP 1:
Disassemble 3/8” x 4“ Bolts (qty 2) that pass through the Connecting Rod part of the trailer - these
will be replaced by longer bolts. Place the Front Foot Bracket (3) on the Connecting Rod so the center bolt
head sits in the clearance hole of the Foot Bracket. Assemble the 3/8” x 5“ Bolts (E) through the 3/8” Washers
(G), Front Foot Bracket (2), and through the Connecting Rod of the trailer.
Finger tighten bolts and nuts at
this time.
Note: It is possible that the
3/8” x 5“ Bolts (E) will not align through the Foot Bracket (3) and Con-
necting Rod. If this happens, loosen the 3/8” x 4“ Bolts (qty 6) that pass through the Connecting Plates and
tap the 3/8” x 5“ Bolts (E) through. Retighten the 3/8” x 4“ Bolts (qty 6).
Connecting Plates
Connecting Rod
No. Item
Qty
No. Item
Qty
1
Front Vertical Bracket
2
A
Bolt 5/16 x 2"
16
2
Rear Vertical Bracket
2
B
Bolt 5/16 x 3"
4
3
Front Foot Bracket
1
C
Nyloc Nut 5/16"
16
4
Rear Foot Bracket
1
D
Bolt 3/8 x 4"
2
5
Fore-Aft Bracket
2
E
Bolt 3/8 x 5"
2
6
Crossbar
4
F
Nyloc Nut 3/8"
4
G
Washer 3/8"
2
Rack Parts
Hardware