Have
r
’s Technical Assistance Service start-up your boiler for the first time. Once this has been done, the boiler
can be left to function automatically. Under certain circumstances, such as after long periods of disuse, the user may
need to re-start it without involving the Technical Assistance Service. Before doing so, perform the following checks and
operations:
- Check that the fuel cock and heating system water
cock are shut.
- While the system is still cold, check that the pressure
(1) in the heating circuit is
over 1 bar
but below the
maximum limit specified for the boiler. If water pressure
is low, contact
r
’s Technical Assistance Service.
- Switch the electricity supply ON at the system’s main
switch and at the control panel.
Check that the display comes on.
- When the boiler is first powered on, it performs a num-
ber of self-tests. These may take a few minutes. When
the tests are completed, the display reads out boiler
temperature.
Perform the following operations on the boiler control
panel.
- Press the "
OK
" button.
Select "
Operator unit
" and press "
OK
".
Select "
Language
" and press "
OK
".
Set the language you want.
SEE THE “USER paRamETERS” maNUaL FOR
INFORmaTION ON CONFIGURaTION.
1
Boiler temperature
Time of day and date
Operator unit
Summary of Contents for TAU UNIT OIL 35 B
Page 1: ...OIL 35 B OIL 35 G TAU UNIT INSTRUCTION FOR THE USER CONDENSING BOILERS...
Page 18: ...USER 18...
Page 19: ......