17
20151674
GB
Installation
5.1
Notes on safety for the installation
After carefully cleaning all around the area where the burner is to
be installed, and arranging for the environment to be illuminated
correctly, proceed with the installation operations.
5.2
Handling
The packaging of the burner includes a wooden platform, so it is
possible to move the burner (still packaged) with a transpallet
truck or fork lift truck.
5.3
Preliminary checks
Checking the consignment
Checking the characteristics of the burner
Check the burner identification label (Fig. 8), showing:
model
A
)
and the type of burner
B
);
the year of manufacture, in cryptographic form
C
);
the serial number
D
);
the electrical supply data
E
);
the electrical power consumption
F
);
the types of fuel used and the relative supply pressures
G
);
the possible minimum and maximum output data of the
burner
H
) (see Firing rate);
maximum absorbed current
I
);
burner weight
L
).
5
Installation
DANGER
All the installation, maintenance and disassembly
operations must be carried out with the electricity
supply disconnected.
WARNING
The installation of the burner must be carried out
by qualified personnel, as indicated in this manual
and in compliance with the standards and regula-
tions of the laws in force.
DANGER
Combustion air inside the boiler must be free from
hazardous mixes (e.g.: chloride, fluoride, halo-
gen); if present, it is highly recommended to carry
out cleaning and maintenance more frequently.
WARNING
The handling operations for the burner can be
highly dangerous if not carried out with the great-
est attention: keep any unauthorised people at a
distance; check the integrity and suitableness of
the available means of handling.
Check also that the area in which you are working
is empty and that there is an adequate escape
area (i.e. a free, safe area to which you can quick-
ly move if the burner should fall).
When handling, keep the load at not more than
20-25 cm from the ground.
After positioning the burner near the installation
point, correctly dispose of all residual packaging,
separating the various types of material.
CAUTION
Before proceeding with the installation operations,
carefully clean all around the area where the burn-
er will be installed.
CAUTION
After removing all the packaging, check the integ-
rity of the contents. In the event of doubt, do not
use the burner; contact the supplier.
The packaging elements (wooden cage or card-
board box, nails, clips, plastic bags, etc.) must not
be abandoned as they are potential sources of
danger and pollution; they should be collected and
disposed of in the appropriate places.
WARNING
The burner output must be within the boiler's firing
rate;
WARNING
A burner label, or any other component, that has
been tampered with, removed or is missing, pre-
vents the definite identification of the burner and
makes any installation or maintenance work diffi-
cult
20122363
GAS
GAZ
....
II
2R 3R
R.B.L.
A
B
C
D
E
F
G H
G H
I
L
RIELLO S.p.A. / I-37045 Legnago(VR) cod. xxxxxxxx
Fig. 8
Summary of Contents for RX 150 S/PV
Page 2: ...Translation of the original instructions...
Page 48: ...20151674 46 GB Appendix Electrical panel layout 0 1 0 0 1 0 RX 150 S PV...
Page 49: ...47 20151674 GB Appendix Electrical panel layout...
Page 50: ...20151674 48 GB Appendix Electrical panel layout...
Page 51: ...49 20151674 GB Appendix Electrical panel layout 0 0 0 1 1...
Page 54: ......
Page 55: ......