
Technical description of the burner
11
20122392
GB
3.7
Burner description
1
Lifting eyebolts
2
Fan
3
Fan motor
4
Air servomotor
5
Gas pressure test point
6
Combustion head
7
Ignition pilot
8
Flame stability disk
9
Electric panel board - cover
10 Hinge for opening burner
11 Air inlet to fan
12 Manifold
13 Thermal insulation screen for securing burner to boiler
14 Gas train flange
15 Shutter
16 Flame inspection window
17 Gas butterfly valve
18 Combustion head air pressure test point
19 Air pressure test point “+”
20 Max gas pressure switch with pressure test point
21 Flame detector
22 Indication for checking the fan motor rotation
23 Gas servomotor
24 Reset button
25 Transparent protection
26 Pilot gas train attachment
2
12
13
19
21
23
3
18
14
26
22
16
22
4 20
6
7
15
5
1
10
1
9
8
24
25
11
17
Fig. 3
20125666
WARNING
The burner can be opened either on the right or left
sides, irrespective of the side from which fuel is sup-
plied. When the burner is closed, the hinge can be
re-positioned on the opposite side.
Summary of Contents for RS 280
Page 2: ...Original instructions ...
Page 37: ...Appendix Spare parts 35 20122392 GB A Appendix Spare parts ...
Page 41: ......
Page 42: ......
Page 43: ......