20168262
26
GB
Installation
5.13.4 Hydraulic circuit diagram
Key
1
Pump suction
2
Pump return line and nozzle return line
3
Pump by-pass screw
4
Pump pressure regulator
5
Safety valve
6
Safety valve
7
Nozzle delivery line
8
Nozzle without interception rod
9
Nozzle return line
10 Pressure variator on nozzle return line
11 Pressure variator servomotor
12 Pressure switch on nozzle return line
13 Safety valve on nozzle return line
14 Safety valve on nozzle return line
15 Pressure switch on pump delivery line
B
Oil valve group and pressure variator
M Pressure gauges
V
Vacuometer connection
OPERATION
Pre-purging phase
:
valves 5), 6), 13) and 14) closed.
Ignition and operation phase
:
valves 5), 6), 13) and 14) open.
Stop:
All valves closed.
B
11
10
P
5
M
M
1
13
6
2
M
4
V
M
12
3
P
15
9
8
7
14
Fig. 30
20159817
WARNING
WARNING
The above-mentioned operation is possible be-
cause the pump is already full of fuel when it
leaves the factory.
If the pump has been drained, fill it with fuel
through the opening on the vacuometer
4)(Fig. 30) prior to starting; otherwise, the pump
will seize.
Whenever the length of the suction piping ex-
ceeds 20-30 meters, the supply line must be filled
using a separate pump.
Summary of Contents for RLS 120/E FGR
Page 2: ...Translation of the original instructions ...
Page 51: ...49 20168262 GB Appendix Electrical panel layout 01 2 3 4506 7 891 01 ...
Page 52: ...20168262 50 GB Appendix Electrical panel layout 0 1 2 2 2 0 ...
Page 54: ...20168262 52 GB Appendix Electrical panel layout 0 0 0 12 3456 7 12 3456 7 ...
Page 57: ...55 20168262 GB Appendix Electrical panel layout 0 0 1 2 3 4 5 667 8 667 2 9 63 8 63 63 3 5 ...