![Riello RL 800/M FS2 Installation, Use And Maintenance Instructions Download Page 25](http://html.mh-extra.com/html/riello/rl-800-m-fs2/rl-800-m-fs2_installation-use-and-maintenance-instructions_1459745025.webp)
23
20034064
GB
Start-up, calibration and operation of the burner
6.1
Notes on safety for the first start-up
6.2
Adjustments before first firing
6.3
Burner starting
Close load controls and set switch 1) (Fig. 25) to "MAN".
Make sure that the lamps or testers connected to the solenoids,
or pilot lights on the solenoids themselves, indicate that no volt-
age is present. If voltage is present, then immediately stop the
burner and check electrical connections.
6
Start-up, calibration and operation of the burner
WARNING
The first start-up of the burner must be carried out
by qualified personnel, as indicated in this manual
and in compliance with the standards and regula-
tions of the laws in force.
WARNING
Check the correct working of the adjustment, com-
mand and safety devices.
+
Fig. 24
D8367
Fig. 25
0 AUTO MAN
- +
1
2
D3108
Summary of Contents for RL 800/M FS2
Page 2: ......
Page 67: ......
Page 72: ...20034064 37 0 0 0 0 1 2 2 0 0 0 0 2 1 1 3 3 1 4 4 4 5 4 6 4 4 4 4 4 4 4 74 7 7 4 4 5 4 ...
Page 73: ...38 20034064 ...
Page 74: ...20034064 39 0 0 0 ...
Page 75: ...40 20034064 ...
Page 76: ...20034064 41 0 1 1 1 ...