Riello RIELLO 7200/3F-800 HV PLUS Installation Instructions Manual Download Page 9

9

Riello 7200/3F HV PLUS

Before the start-up and before testing the storage cylin-

der the storage cylinder, it is absolutely necessary to 

check that:

- The non-domestic hot water circuit supply taps are 

open

- Any water connections which connect to the boiler 

and to the water unit of the solar system have been 

carried out correctly

- The procedure for washing and filling up the solar he-

ating circuit with the water-glycol - if necessary - has 

been carried out correctly, and the equipment has 

been de-aerated at the same time.

10   Commissioning

11   Maintenance

12   Cleaning the storage cylinder and dismantling the internal components

Periodic maintenance, which is essential for safety purposes, the efficiency and the life of the solar storage cylinder, 

provides reduced consumption and keeps the product reliable over time. Remember that the maintenance of the 

storage cylinder can be carried out by the Riello Technical Assistance Centre or else by qualified professional person-

nel and should take place at least once a year.

Before doing any maintenance work:

- Disconnect any relevant components of the storage 

cylinder's hydraulic unit from the electrical supply and 

respective generator, positioning the main switch and 

that of the control panel to "off"

- Close the shut-off devices of the non-domestic hot 

water system

- Drain the storage cylinder, or - in the event that there 

is a primary circuit - drain the storage cylinder's se-

condary circuit.

OUTSIDE

Cleaning the cover of the storage cylindershould be carried out with damp cloths and water and soap. In the case of 

stubborn stains dampen the cloth with a mixture of 50% water and methylated spirit or with specific products for the 

marks. Once the cleaning is finished, dry the storage cylinder.

    Do not use abrasive products, gasoline or trichloroethylene.

INSIDE

- Using a wrench, unscrew the bolts which fix to the flange and remove the counter flange together with its gasket

- Clean the inside surfaces and remove the residues through the opening.

Once the cleaning operations are finished, reassemble all the components, following the above instructions in the 

reverse order.

    Tighten the flange fixing bolts in a diagonal manner to uniformly distribute pressure on the gasket.

- Fill the storage cylinder's circuit and check the seal of the gaskets.

- Carry out a performance test.

Summary of Contents for RIELLO 7200/3F-800 HV PLUS

Page 1: ...cod Doc 0071233 rev 2 10 2015 Solar storage cylinders 7200 3F 800 1000 1500 2000 3000 HV PLUS EN INSTALLATION INSTRUCTIONS...

Page 2: ...e parts if required This instruction booklet contains important information and suggestions that should be observed for easy instal lation and better use of the solar storage cylinder Riello 7200 3F H...

Page 3: ...carried out Turn off the system s main switch Drain the solar heating circuit if present and the heating system Close the shut off devices of the water system Switch off the boiler as described in th...

Page 4: ...0 1990 2959 I Dispersion 174 193 250 305 344 W 4 176 4 632 6 7 32 8 256 kWh 24h Insulation type Soft PU shells Useful non solar volume Vbu 420 490 790 1210 1745 I 4 Techical data The solar storage cyl...

Page 5: ...Thermometer connection AD1 AD2 Magnesium anode The solar storage cylinder Riello 7200 3F HV PLUS is not equipped with load circulators which should be appropriately sized and installed on the system...

Page 6: ...F 1 2 F 1 2 F S Probe 1 2 F 1 2 F 1 2 F 1 2 F 1 2 F TR Thermometer 1 2 F 1 2 F 1 2 F 1 2 F 1 2 F RE Electric resistor socket not supplied 1 1 2 F 1 1 2 F 1 1 2 F 1 1 2 F 1 1 2 F A 1460 1720 1720 1990...

Page 7: ...ings of the pipe coupling the thermoformed cover the flange covers the identification labels and the documentation Installation of the AD1 AD2 magnesium anodes Use the anodes provided during assembly...

Page 8: ...ss than 50 ppm Total hardness less than 35 F Sulphur ions none Ammonia ions none Silicon ions less than 30 ppm The handling of the storage cylinder is carried out with equipment that is suitable for t...

Page 9: ...connect any relevant components of the storage cylinder s hydraulic unit from the electrical supply and respective generator positioning the main switch and that of the control panel to off Close the...

Page 10: ...10 Riello 7200 3F HV PLUS...

Page 11: ......

Page 12: ...0442630111 Fax 044222378 www riello it The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore lia...

Reviews: