58
8. ELECTRODES ADJUSTMENT
9. BURNER OPERATION
9.1 BURNER START UP CYCLE
ALTERNATIVE START-UP CYCLES
1) If you desire the pre-ignition being present during the complete pre-purge phase (37 s): remove the bridge from
the terminals 11 - 3 and put it on the terminals 11 - 7 of the control box.
2) If you desire to reduce the pre-purge period from 37 to 20 s (with contemporaneus presence of the pre-ignition)
remove the wire from the terminal no. 7 to the no. 3 of the control box (maintaining the bridge to the terminals
11 - 3).
THREE STAGE OPERATION
1 5 mm
4 mm
D11353
The measures must be respected.
WARNING
Normal
Lock-out because of no ignition
Thermostat
Motor
Ignition transformer
Safety valve
1
st
flame valve
2
nd
flame valve
3
rd
flame valve
Lock-out signal
D2896
max
0
3
rd
stage
2
nd
stage
1
st
stage
Summary of Contents for P 140 T/G