23
BURNER START UP REPORT
Model number:
Project name:
Installing contractor:
Serial number:
Start-up date:
Phone number:
GAS OPERATION
Gas Supply Pressure:
Main Power Supply:
Control Power Supply:
Burner Firing Rate:
Manifold Pressure:
Pilot Flame Signal:
Low Fire Flame Signal:
High Fire Flame Signal:
CO
2
: Low Fire
O
2
: Low Fire
CO: Low Fire
NO
X
: Low Fire
Net Stack Temp - Low Fire:
Comb. Efficiency - Low Fire:
Overfire Draft:
High Fire
High Fire
High Fire
High Fire
High Fire:
High Fire:
OIL OPERATION
Oil supply pressure:
Oil suction pressure:
Control Power Supply:
Burner Firing Rate:
Low Fire Flame Signal:
High Fire Flame Signal:
Low Fire Nozzle Size:
High Fire Nozzle Size:
CO
2
: Low Fire
O
2
: Low Fire
CO: Low Fire
NO
X
: Low Fire
Net Stack Temp - Low Fire:
Comb. Efficiency - Low Fire:
Overfire Draft:
Smoke number:
High Fire
High Fire
High Fire
High Fire
High Fire:
High Fire:
CONTROL SETTINGS
Operating Setpoint:
High Limit Setpoint:
Low Gas Pressure:
High Gas Pressure:
Low Oil Pressure:
High Oil Pressure:
Flame Safeguard Model Number:
Modulating Signal Type:
NOTES
Summary of Contents for C9511200
Page 14: ...14 RL 28 2 38 2 SINGLE PHASE ...
Page 15: ...15 RL 50 2 SINGLE PHASE ...
Page 16: ...16 RL 28 2 38 2 50 2 SINGLE PHASE ...
Page 17: ...17 RL 38 2 50 2 THREE PHASE ...
Page 18: ...18 RL 38 2 50 2 THREE PHASE ...