
19
20162733
GB
Installation
5.4
Operating position
5.5
Preparing the boiler
5.5.1
Boring the boiler plate
Drill the combustion chamber locking plate as shown in Fig. 10
(Tab. I). The position of the threaded holes can be marked using
the thermal screen supplied with the burner.
5.5.2
Blast tube length
The length of the blast tube must be selected according to the in-
dications provided by the manufacturer of the boiler, and in any
case it must be greater than the thickness of the boiler door com-
plete with its fettling.
For boilers with front flue passes 1)(Fig. 11) or flame inversion
chamber, a protection in refractory material 5) must be inserted
between the boiler fettling 2) and the blast tube 4).
The refractory can have a conical shape (minimum 60°).
This protective fettling must not compromise the extraction of the
blast tube.
For boilers with a water-cooled front piece, a refractory lining 2)-
5)(Fig. 11) is not necessary, unless expressly requested by the
boiler manufacturer.
Tab. I
5.6
Securing the burner to the boiler
Fit the heat insulation supplied onto the blast tube
4)(Fig. 11).
Fit the entire burner onto the boiler hole prepared previously
(Fig. 10), and fasten with the screws supplied.
WARNING
The burner is designed to operate only in
positions
1
,
2
,
3
and
4
(Fig. 9).
Installation
1
is preferable, as it is the only
one that allows the maintenance operations
as described in this manual.
Installations
2
,
3
and
4
permit operation but
make maintenance and inspection of the
combustion head more difficult.
DANGER
Any other position could compromise the cor-
rect operation of the appliance.
Installation
5
is prohibited for safety reasons.
Fig. 9
2
3
4
5
1
D7739
mm
A
B
C
RS 410/EV FGR
335
452
M18
RS 510/EV FGR
335
452
M18
RS 610/EV FGR
350
452
M18
Fig. 10
D455
Prepare a suitable lifting system using the rings
3)(Fig. 11), after removing the fixing screws 7) of
the casing 8).
WARNING
The seal between burner and boiler must be
airtight.
20069488
Fig. 11
Summary of Contents for 20162652
Page 2: ...Translation of the original instructions...
Page 45: ...43 20162733 GB Appendix Electrical panel layout...
Page 48: ...20162733 46 GB Appendix Electrical panel layout...
Page 49: ...47 20162733 GB Appendix Electrical panel layout...
Page 50: ...20162733 48 GB Appendix Electrical panel layout 0 0 0 1 0 2 0 0 0 0 0 0 0 0 0 0 1 0...
Page 51: ...49 20162733 GB Appendix Electrical panel layout 0 0 0 1 1 1 2 1 3 1 1 1 1 1 1 1 41 4 4 1 1 2 1...
Page 57: ......
Page 58: ......
Page 59: ......