
26
INSTALLATION
ENGLISH
2
INSTALLATION
2.1
Receiving the product
The
BAG
3
(1) is supplied in one package, protected by cardboard
packaging (2) inside of which there is a plastic envelope con-
taining:
−
Plumbing connection ramps (3) towards the heat gen-
erator
−
Brackets (4) and wiring case (5)
−
Instruction manual (6)
2
1
3
6
4
5
9
The packing material is to be conserved and not discarded
as it could be potentially dangerous.
2.2
Dimensions and weights
L
P
H
BAG
3
3 AP
2 AP
AP
L
400
P
160
H
720
Net weight of box (*)
8
Net weight of appliance
18
15
12
(*) The box is supplied separately, on request as an accessory .
2.3
Installation inside the box
9
Before installing
BAG
3
inside the box, check that all the con-
nectors are correctly tightened.
9
If the insulation kit is to be
fi
tted, supplied as an accessory
upon request, ensure that the hydraulic module inside the
box is correctly positioned.
9
A suction pipe is inserted inside the mixing bottle and this
must not under any circumstances be removed. Do not re-
move the closing plug (1) of the suction pipe, located on the
top connector of the mixing bottle, until instructions to do
this are given.
1
Summary of Contents for 20082277
Page 17: ...17 MANUTENZIONE ITALIANO...
Page 34: ...34 MAINTENANCE ENGLISH...
Page 35: ...35 MAINTENANCE ENGLISH...