background image

5861

5

ELECTRICAL CONNECTIONS TO THE WIRING TERMINAL BLOCK

(to be carried out by the installer)

   

Notice

 - Leads minimal section 1 mm

2

.

- The electric wiring carried out by the installer must be in compliance with the rules in force in the Country.

FIXING OF THE ELECTRICAL WIRES

All the electrical wires, which are to be connected to
the terminal block 5) (fig. 1) shall pass through the fair
leads 4) (fig. 1) as for this scheme.     

1

- Three phase supply

: fair lead Pg 21

2

-

 Single phase supply

:

fair lead Pg 13.5

3

- Adjustment thermostat : fair lead Pg 13.5

4

- Safety thermostat

: fair lead Pg 13.5

5

- Gas train

: fair lead Pg 13.5,

sheath µ 13

6 / 7 / 8 /9

- Pre-sheared holes

Further prospective signals or controls can be connected to the burner wiring terminal board by removing
the metal weldnuts from the pre-sheared holes and inserting a commun fair lead for the passage and the
clamping of the leads.

NOTES

- Do not exchange the neutral wire with the phase (avoid the plug-pin connection).
- Carry out a safe earth connection.
- Check the stop of the burner, by opening the boiler thermostat and the burner lock-out, by disconnecting

the lead from the flame probe.

WARNING

When closing the burner on its slide-bars, pull towards the outside the high voltage cable and the cable
of the flame detection probe, till to little tension.

H

Remote lock-out signal

H 1

Remote lock-out signal of leak

        detection control device

IN

Burner manual stop switch

MB

Burner terminal strip

PG

Min. gas pressure switch 

TS

Safety control device system

TL

Limit control device system

VPS

Leak detection control device

VR

Adjustement valve

VS

Gas safety valve

XP7

Plug for leak detection control

        device

KEY TO LAYOUT

S7529

D2657

F Ampere

T6

S mm

2

1

Summary of Contents for GAS 5

Page 1: ...2915861 1 Installation use and maintenance instructions Gas burner CODE MODEL TYPE 3751782 GAS 5 517 T80...

Page 2: ...phase 380 V 10 10 60Hz with neutral Motor 1 9 A 380 V Ignition transformer Primary 1 8A 220V Secondary 1 x 8 kV 30 mA Absorbed electrical power 1 1 kW 1 Air shutter control 2 Air shutter lock nut 3 Co...

Page 3: ...rews 1 and 2 and withdrawing the group A from the holding bars 3 Fix the group B to the boiler front plate 4 using the gasket 5 provided as accessory 2 3 5 4 1 A B S7499 1 Gas pipe line 7 Gas shut off...

Page 4: ...in 550 kW it is necessary a gas pressure of 9 mbar and the combustion head set as indicated at page 7 If the combustion chamber is pressurized at 2 mbar the pressure detected at the test point 8 is 9...

Page 5: ...e K1 Relay MB Burner terminal strip MV Fan motor PA Air pressure switch RMG Control box RT Overload S Suppressor SO Ionisation probe TA Ignition transformer TB Burner earth KEY TO LAYOUT ATTENTION In...

Page 6: ...ing the metal weldnuts from the pre sheared holes and inserting a commun fair lead for the passage and the clamping of the leads NOTES Do not exchange the neutral wire with the phase avoid the plug pi...

Page 7: ...nt pressure by turning slowly clockwise the knob till reaching the burner lock out Thereafter turn the knob anticlockwise for 1 mbar and repeat the burner start up for checking the regularity if lock...

Page 8: ...the plate 4 Tighten the screws 1 Gas setting Loosen the screw 5 move the ring 6 so that the pointer 7 is coincident with the desired set point 8 Tighten the screw 5 Attention the set point number is t...

Page 9: ...e burner normally supplies a higher current value so that no check is needed However if a measurement of the ionization current is required it is necessary to disconnect the probe lead and insert a d...

Page 10: ...iled The burner does not pass through the pre purge peri od and the control box goes to lock out The air pressure switch does not change over it has failed or the air pressure is too low combustion he...

Page 11: ...ame signal Electrical supply lower than 170V Lock out Extraneous light Key Off Yellow Green Red SIGNAL PROBABLE CAUSE 2 flashes The flame does not stabilise at the end of the safety time faulty ionisa...

Page 12: ...RIELLO S p A Via degli Alpini 1 I 37045 Legnago VR Tel 39 0442 630111 Fax 39 0442 630375 http www rielloburners com Subject to modifications...

Reviews: