
5894
2
COMBUSTION CHAMBER PRESSURE - MAXIMUM OUTPUT
(two nozzles in operation)
When the burner operates with only one nozzle, the pressurization conditions are improved and no problems arise.
Minimal fuel capacity with only one nozzle: 10 kg/h - 114 kW
Note for the extend. combustion head version
Apply the extensions provided as accessories for the burner withdrawing.
Front plate detail for
boiler mounting