4.Replacement and Adjustment
67
ITB Contact Sensor (S6)
1.
Remove the rear cover. (
2.
Remove the operation panel. (
3.
Remove the right cover. (
4.
Remove the HVPS. (
HVPS (High Voltage Power Supply) (PCB3)
5.
Remove the ITB contact sensor assembly [A]. (
× 1,
× 1)
6.
Release the hooks to remove the ITB contact sensor (S6) [B].
TM/P Sensor (S8) Unit
1.
Remove all AIO cartridges. (
2.
Pull out the image transfer belt unit a little. (
3.
Remove the rear cover. (
4.
Remove the controller box cover [A].
Printer model:
Summary of Contents for M C250FW
Page 2: ......
Page 8: ......
Page 12: ......
Page 34: ...3 Preventive Maintenance 22 to remove any remaining moisture ...
Page 45: ...4 Replacement and Adjustment 33 6 Release the belt A and then remove the front cover unit B ...
Page 103: ...4 Replacement and Adjustment 91 MF model 11 Remove the fusing transport drive unit A ...
Page 112: ...4 Replacement and Adjustment 100 MF model 8 Remove the belt cover A ...
Page 183: ...5 System Maintenance 171 8 Press OK on the screen or press on the number keys to exit ...
Page 188: ...5 System Maintenance 176 Special Sender List Configuration Page Printer model ...
Page 189: ...5 System Maintenance 177 MF model ...
Page 260: ...6 Troubleshooting 248 Flowchart ...
Page 271: ...7 Detailed Descriptions 259 ...
Page 297: ...7 Detailed Descriptions 285 Boards Block Diagram Printer Model ...
Page 301: ......