background image

Step 5 - 

 

Reinstall the drawer box and slide 

the Docking Drawer Blade Series receptacle 
box through the cutout. Secure it with the 4 
receptacle box mounting screws.

Step 6 - 

 

Align arms. With the drawer mostly 

closed, mark the position of the rear mounting 
bracket. It is important to make sure the 
drawer moves freely in and out and that the 
arms are square and even. Spend sufficient 
time at this step before fastening the bracket 
to the rear wall to make sure everything 
is square and the arms are in the correct 
position. Once that is done, secure with the 3 
rear mounting bracket screws provided.

Step 7 - 

 

Install the 

cover plate.

Step 8 - 

 

Connect the Docking Drawer power 

cord to the in-cabinet electrical supply. For 
more details about locating an in-cabinet 
electrical supply for your Docking Drawer 
installation, please refer to the Electrical 
Planning Guide located at dockingdrawer.com/
downloads.

BLADE DUO PART #:

1514-2xx

2012-2xx

How to Operate the Outlet

CUT

OUT

 TEMPLA

TE

 

for

 Blade Duo

F

OR 

A

C

CUR

A

C

Y

 SC
ALE PRINTER 

T

O 100%

120º

F

Docking Drawer

Wall 

Receptacle

Have questions? Need help? Call us!

[email protected]          

www.dockingdrawer.com      

           

(925) 233-5598          

12893 Alcosta Blvd, Suite M, 
San Ramon, CA 94583

®

AG022521

The 15 and 20 amp Blade Duo and Blade series 
in-drawer outlets include a 120˚F interlocking 
thermostat to protect against overheating 
inside the drawer. To reset, correct the source 
of over temperature and push the button in 
the center of the vents of the cover plate. Note: 
You may need to wait a few minutes for the 
unit to cool before the thermostat can be reset.

Push to reset 

interlocking 

thermostat

 Wiring Diagram:

Reviews: