![Rice Lake RoughDeck ALTRALITE Installation Manual Download Page 11](http://html1.mh-extra.com/html/rice-lake/roughdeck-altralite/roughdeck-altralite_installation-manual_1454217011.webp)
CELL 1
CELL 4
CELL 2
CELL 3
INDICATOR
+EX
–EX
+SI
–SI
100 K
+SE
–SE
+EX
+EX
+EX
+EX
–EX
–EX
–EX
–EX
+SI
+SI
+SI
+S
I
–SI
–SI
–SI
–SI
SHD
SHD
SHD
SHD
23126
Rev. A
SHD
JU1
JU2
JU3
JU4
100 K
100 K
100 K
Installation
7
Figure 2-3. Junction Box Indicator Terminal
The cable must be routed to the indicator in a manner that will protect the cable from damage. Two methods of
cable protection in non-washdown applications are shown in Figure 2-4. When planning cable routing with either
of these two methods, leave a loose coil of excess cable under the scale to facilitate future lifting of the scale for
servicing or cleaning.
LOAD CELL CABLE
STEEL COVER
FLOOR
SCREW
LOAD CELL CABLE
STEEL COVER
Figure 2-4. Cable Protection
Strain Relief
Flex Fitting
Figure 2-5. Standard Junction Box
Note
In washdown applications, we recommend removing the junction box entirely from the floor
platform and mounting it externally on a wall or in some other protected location.
When the interface cable is protected and in its final
position, complete connections to the indicator.
See indicator installation manual for wiring
information.
1. If necessary, trim corners as described in
2. Check all strain relief fittings for tightness.
3. Screw on the junction box cover.
4. Slide the junction box tray into the cutout.
5. Secure it with the two #10 x 3/8" screws
provided.